24
2-way valve approximately 45
’
until the gauge indicates 0.3 to 0.5 Mpa.
6). Disconnect the charge set and the charging cylinder, and set the 2-way and 3-way valves to the open
position.
Be sure to use a hexagonal wrench to operate the valve stems.
7). Mount the valve stems nuts and the service port cap
Be sure to use a torque wrench to tighten the service port cap to a torque 18N
·
m.
Be sure to check the gas leakage.
3. Adding the refrigerant if the pipe length >5m
Procedure:
1). Connect the charge hose to the charging cylinder, open the 2-way valve and the 3-way valve.
Connect the charge hose which you disconnected from the vacuum pump to the valve at the bottom of
the cylinder. If the refrigerant is R410A, make the cylinder bottom up to ensure the liquid charge.
2). Purge the air from the charge hose
Open the valve at the bottom of the cylinder and press the check valve on the charge set to purge the
air (be careful of the liquid refrigerant).
3) Put the charging cylinder onto the electronic scale and record the weight.
4) Operate the air conditioner at the cooling mode.
5) Open the valves (Low side) on the charge set and charge the system with liquid refrigerant.
6).When the electronic scale displays the proper weight (refer to the table), disconnect the charge hose
Electronic scale
Summary of Contents for MOA-07HN1-QC2
Page 11: ...9 3 Dimension 3 1 Indoor Units Figure 1 Figure 2...
Page 16: ...14 MSX 21HRN1 QB8W MSX 24HRN1 QB8W...
Page 17: ...15 5 2 Outdoor Units MOA 07HN1 QC2...
Page 18: ...16 MOA1 09HN1 QC2 MOA 09HN1 QC2 MOB1 12HN1 QC2 MOB 12HN1 QC2...
Page 19: ...17 MOF 18HN1 QC2...