26
Close the valve on the charging cylinder and discharge the refrigerant by loosening the flare nut on the
2-way valve approximately 45’ until the gauge indicates 0.3 to 0.5 Mpa.
6). Disconnect the charge set and the charging cylinder, and set the 2-way and 3-way valves to the open
position.
Be sure to use a hexagonal wrench to operate the valve stems.
7). Mount the valve stems nuts and the service port cap.
Be sure to use a torque wrench to tighten the service port cap to a torque 18N
·
m.
Be sure to check the gas leakage.
3. Adding the refrigerant if the pipe length >5m
Procedure:
1). Connect the charge hose to the charging cylinder, open the 2-way valve and the 3-way valve.
Connect the charge hose which you disconnected from the vacuum pump to the valve at the bottom of
the cylinder. If the refrigerant is R410A, make the cylinder bottom up to ensure the liquid charge.
2). Purge the air from the charge hose
Open the valve at the bottom of the cylinder and press the check valve on the charge set to purge the
air (be careful of the liquid refrigerant).
3) Put the charging cylinder onto the electronic scale and record the weight.
4) Operate the air conditioner at the cooling mode.
5) Open the valves (Low side) on the charge set and charge the system with liquid refrigerant.
Electronic scale
Summary of Contents for MOA-11HN1-QB8
Page 1: ...LUNA ON OFF SERIES Service Manual 2014 9ASEU B1 1401...
Page 16: ...14 MS9A 12HRN1 QC7G...
Page 17: ...15 MS9A 18HRN1 QC5...
Page 18: ...16 MS9A 24HRN1 QB8W...
Page 20: ...18 MOC 17HN1 QC0...
Page 21: ...19 MOC 18HN1 QC0 MOF3 18HN1 QC5...
Page 22: ...20 MOP 24HN1 QB8W...
Page 23: ...21 MOF1 24HN1 QB8W...