Service manual
- 21 -
8 Installation details
8.1 Wrench torque sheet for installation
Torque
mm
inch
Kg.m
φ
6.35
1/4
1.8
φ
9.52
3/8
4.2
φ
12.7
1/2
5.5
φ
15.88
5/8
6.6
φ
19.05
3/4
6.6
Outside diameter
8.2 Connecting the cables
The power cord of connect should be selected according to the following specifications sheet.
Amp
10
15
20
mm
2
1.0
1.5
2.5
Grade
8.3 Pipe length and the elevation
Standard
length
Max.
Max.
Additional
(m)
Elevation
Elevation
refrigerant
Btu/h
GAS
LIQUID
B (m)
A (m)
(g/m)
3/8’’ (
φ
9.52)
1/4’’ (
φ
6.35)
5
5
10
30
1/2’’ (
φ
12.7)
1/4’’ (
φ
6.35)
5
5
10
30
1/2’’ (
φ
12.7)
1/4’’ (
φ
6.35)
5
8
15
30
5/8’’ (
φ
15.88)
1/4’’ (
φ
6.35)
5
10
20
30
5/8’’ (
φ
15.88)
3/8’’ (
φ
9.52)
5
10
20
65
5/8’’ (
φ
15.88)
3/8’’ (
φ
9.52)
5
15
30
65
3/4’’ (
φ
19.05)
3/8’’ (
φ
9.52)
5
15
30
65
Pipe size
7k~12K
16K~28K
30K~36K
Capacity