Have plenty of fresh water and soap nearby in case battery acid contacts skin, clothing or eyes. 

Wear complete eye and clothing protection. Always avoid touching eyes while working near 

batteries. If battery acid or battery terminal corrosion contacts skin or clothing, wash 

immediately with soap and water. If acid enters the eyes, immediately flood with cool running 

water for at least 15 minutes and get medical attention immediately. Baking soda neutralizes 

battery acid electrolyte. Keep a supply near the batteries.  

 

Do not work alone. Someone should be in the range of your voice or close enough to come to 

your aid when you work with or near electrical equipment.  

 

Remove rings, bracelets, necklaces, watches etc. when working with batteries, photovoltaic 

modules or other electrical equipment. Power from an illuminated photovoltaic array makes a 

very effective arc welder with dire consequences if one of the welded pieces is on your person. 

 

To reduce the risk of injury, connect only deep cycle lead acid type rechargeable batteries. Other 

types of batteries may leak or burst, causing personal injury or damage. 

 

Assembly Instructions 

 

Hardware kit contents 

Midnite PN  Description 

MNBE-B  MNBE-D  MNBE-D3R  MNBE-E 

3-089-1 

Fan hole cover plate 1.75” 

3-095-1 

Fan hole cover plate GJ1 

5-029-1 

Midnite Solar Badge 

6-006-1 

10-32 X 3/8 Machine Screw 

16 

6-029-1 

#10 X 3/8 Flat Head Screw 

13 

13 

6-057-1 

#6 X 3/8 Screw Type A 82

 

25 

25 

25 

25 

6-088-1 

#10 X 3/8 Screw Type B  

40 

40 

21 

40 

9-052-1 

Hinge 

2 PKG (2)  2 PKG (2)  2 PKG (2)  2 PKG (2) 

9-204-1 

Keyed Handle 

9-205-1 

Pawl 

9-213-1 

Hole Plug 

10-016-1 

Assembly Instructions 

 

Preparation: 

You will require a #2 Philips screw driver and a 5/16” wrench to tighten screws, as well as a 

slotted screw driver and hammer to remove knockouts.   

 

Step 1: 

Attach shelves to the two sides as shown below. 

Use eight #10 x 3/8” sheet metal screws. 

4 Screws per shelf. Bottom shelf is the floor of the unit. 

 

 

 

Step 2

#10 x 3/8” Stainless Steel 

Hex head sheet metal screw 

Summary of Contents for MNBE-B

Page 1: ...R E Instructions Rev A Page 1 of 10 Battery Enclosure Installation Instructions These instructions are for the assembly of Midnite Solar Battery Enclosure models MNBE B MNBE D MNBE D3R and MNBE E MNBE...

Page 2: ...ombiner cover the modules with an opaque material before servicing any connected equipment Never attempt to charge a frozen battery When it is necessary to remove a battery make sure that the battery...

Page 3: ...re consequences if one of the welded pieces is on your person To reduce the risk of injury connect only deep cycle lead acid type rechargeable batteries Other types of batteries may leak or burst caus...

Page 4: ...ts see step 4B Step 3 Install the back panels Both panels are identical Make sure to orient them so that the knock outs are located in the upper half of the panel You will use 10 x 3 8 Hex head SS she...

Page 5: ...t door lip Step 4B MNBE D3R Only Install outer covers as shown using four 10 32 X 3 8 Machine Screws from the inside This is easier before the doors are installed Run a bead of silicone sealant along...

Page 6: ...ne sealant along the back panels to seal the back Step 5 Attach the left door Each hinge will use three 6 x 3 8 Flat head screws to secure the hinge to the sides The screws supplied with the hinge are...

Page 7: ...gn with slot in the bottom of shelf Lock Installed Lock shown latched Parts of lock assembly Your Battery enclosure is now fully assembled Before placing batteries on shelves make sure the enclosure i...

Page 8: ...onnected together side by side for additional storage 2 conduit knock outs are provided on each side of the enclosure to accommodate this configuration Use a 6 long conduit to connect the two cabinets...

Page 9: ...t group 31 batteries Notice that in this configuration there are 4 parallel strings Parallel strings can be a problem when too many are involved in cyclic applications such as in an off grid installat...

Page 10: ...hus good for 1260 watt hours Eight of these batteries yields 10 080 watt hours No matter how these batteries are configured they will still be the same watt hour battery bank Be careful when looking a...