MND3RACCPLME (continued) 

 

14 | 

P a g e                                                                                                                       1 0 - 2 2 0 - 1         R E V :   B

 

 

 

TESTING THE SETUP 

 
 
 
 
After everything is set and everything appears to be in order we suggest running a test when you have time 
to watch the system through a cycle. To run the test Turn off the Inverter AC input breaker inside the AC 
Coupled box. 
 
 

 

 

 
At this time the system should power the critical loads panel from the batteries and the grid tie inverter 
should be charging batteries. What we want to watch is the Magnum Router screen on the door and keep 
an eye on the battery voltage. The voltage should rise as the batteries are filled (If the loads are too great 
on the critical load panel it may not rise, if this is the case turn some loads off) and when the battery 
voltage rises to the 29.0 we programmed into the AUX relay. When the relay opens the grid tie should 
drop off and the battery voltage should drop slowly until it reaches the 26.4 volts we programmed at this 
time the relay should close and 5 minutes later the grid tie system will re-engage. 
 

WARNING: If you see the voltage go above 29 and the relay does not disengage turn off the Grid tie 
inverter AC input breaker and re check all the settings programmed into the router. 
 
 
 
 
 
 
 
 
 

Summary of Contents for MND3RACCPLME

Page 1: ...Magnum AC Coupled In a D3R battery box MND3RACCPLME 7 22 15...

Page 2: ...other sources of power to the inverter are in the off position Then remove the negative terminal from the battery first To reduce risk of battery explosion follow these instructions and those publish...

Page 3: ...eserved MidNite Solar Inc reserves the right to revise this document and to periodically make changes to the content hereof without obligation or organization of such revisions or changes unless requi...

Page 4: ...rvice on the dwelling Please consult all Local State and federal codes that may apply to this install as well as acquire any permits that may be needed This device is not intended to be relied on for...

Page 5: ...cation to install the Battery box both for wiring as well as stability We recommend if it is to be installed outdoors you try to keep it out of direct sunlight You will need to secure the box using th...

Page 6: ...branch circuit 30 amps or less from the utility Main panel to the buss bars Labeled AC Hot In 2 A 4 wire 120 240VAC circuit from the buss bars labeled AC Out to Critical Loads panel to the sub panel...

Page 7: ...Buss Bars for step 1 this is where the feeder from the utility main panel will connect The first picture shows the common AC Neutral as well as the Earth ground buss bar These 2 buss bars will be use...

Page 8: ...MND3RACCPLME continued 8 P a g e 1 0 2 2 0 1 R E V B Buss bars for Step 2 AC Out to the Critical Loads panel Buss bars for Step 3 AC in from the Grid Tie Inverter...

Page 9: ...MND3RACCPLME continued 9 P a g e 1 0 2 2 0 1 R E V B Below is a wiring diagram showing the AC wiring to be done in the field...

Page 10: ...d as you can see from the picture you simply need to slide the 4 batteries in and connect them in a series string for 24 vdc We are recommending the Concorde PVX3050T 6 volt batteries for this For oth...

Page 11: ...neral use outlet 15 amp AC breaker for the general use outlet This should be on at all times Invert or Bypass Slider Up is Normal and down by passes the Magnum inverter This will normally always be up...

Page 12: ...ter To navigate through the 1 through 3 menus follow the steps below On initial Power up the Router will ask you to set the time To Set the Current Time 1 Turn the Select knob to the hour of day and t...

Page 13: ...knob to enter the Inverter menus To set the menu items scroll to the menu item you need to edit and press the Select knob Scroll the select knob to change the value and press the select knob to go bac...

Page 14: ...and keep an eye on the battery voltage The voltage should rise as the batteries are filled If the loads are too great on the critical load panel it may not rise if this is the case turn some loads of...

Page 15: ...pt for the warranty that the products are made in accordance with the specifications therefore supplied or agreed to by customer MIDNITE SOLAR MAKES NO WARRANTY EXPRESSED OR IMPLIED AND ANY IMPLIED WA...

Reviews: