ASSEMBLY INSTRUCTIONS 

 

 

Break bundles and hardware box. Sort all parts according to 

size. Depending on the model ordered, you may have extra 

parts. 

END HOOD ASSEMBLY

(Refer to Diagram A for a final assembly view)

The  first  step  will  be  to  assemble  the  end  hoods.  Locate 

the adjustable canopy end assemblies. Note that there are 

two- right and two- left hand assemblies. (See Diagram B, 

Detail E.)

Next locate two of the canopy bows and place them on the 

floor or ground with one each of the right and left hand as-

semblies placed at each end of the bows.

Identify the canopy bow that will be installed as the bow that  

will form the upper curved portion of the canopy end section. 

Slide two (2) each of the plastic canopy cord spool hooks on 

each end of this canopy bow. A total of four canopy cord spool 

hooks will be placed on this bow. 

Insert one end of the two canopy bows over the round tubes 

on one of the adjustable canopy end assemblies. Note that 

one bow will lay flat on the floor while the other bow with the 

canopy cord spool hooks installed will curve upward in the 

form of the canopy once it is completely assembled.

Insert the other ends of the canopy bows onto the round tubes 

on the second adjustable end assembly. Make sure that the 

canopy bows are slid onto the round tubes as far as they can 

without jamming or driving them on.

Mark the centers on the two canopy bows. Locate one of the 

19” canopy end spacer tubes (Item 22 in Diagram B, Detail 

E). Attach it to the canopy bow that is laying flat on the floor 

or ground at the center location just marked. Secure together 

with an end hood loop using a 1/4” x 2-1/4” carriage bolt and 

nut provided  as shown.  Slip one of the canopy cord spool 

hooks  onto  the  19”  canopy  end  spacer  tube.  Secure  the 

other end of the spacer tube to the top bow with a second 

end hood loop and 1/4” x 2-1/4” carriage bolt. Secure with a 

¼” hex nut. Tighten. 

Locate one of the 16” canopy end spacer tubes (Item 18 in 

Diagram B, Detail D). Attach it to the canopy bow that is laying 

flat on the floor or ground at the ¼ point (center between the 

end of the canopy bows and the 19” spacer tube just installed 

in the center). Secure together with an end hood loop using 

a 1/4” x 2-1/4” carriage bolt and nut provided as shown. Slip 

one  of  the  canopy  cord  spool  hooks  onto  the  16”  canopy 

end spacer tube.  Rotate the spacer tube up and slide either 

towards or away from the 19” center spacer tube until it will 

fit between the two canopy bows. Secure the other end of the 

spacer tube to the top bow with a second end hood loop and 

1/4” x 2-1/4” carriage bolt. Secure with a ¼” hex nut. Tighten.  

Repeat on the other side of the end hood assembly.

Locate the ½” long black plastic caps supplied in the hard-

ware.  Push  one  of  them  onto  each  of    the  bolts  sticking 

through the nut securing the spacer tube to the flat canopy 

bow.  This will protect the vinyl cover from fraying when it 

comes in contact with the bolt. 

Measure up and place a mark at 7 ½” and 10 ½” from each 

end of the upper canopy bow forming the top curve. Place 

the mark on the bottom side of the tube.  

Summary of Contents for ShoreStation CF24-120N

Page 1: ...ge 1 REV A 4 12 06 CF24 120N CF26 120N CF30 120N Canopy Frames Fitting Aluminum Hoist Models SSV30 40120 SSPV30 40120 SS30 40120 DW SSPV30 40120 DW SSV50120 SSV50120 DW Hydraulic Hoist Models SSV40120...

Page 2: ...Midwest Industries Inc Ida Grove IA 51445 800 859 3028 www shorestation com 0003526 Page 2 REV A 4 12 06 Diagram B...

Page 3: ...ows Locate one of the 19 canopy end spacer tubes Item 22 in Diagram B Detail E Attach it to the canopy bow that is laying at on the oor or ground at the center location just marked Secure together wit...

Page 4: ...ntered in the splice Repeat the process on the other side frame tube Tighten the stainless steel hose clamps evenly and securely around the side frame splice placing two of the clamps at the very ends...

Page 5: ...mes the framework assembly is now complete The canopy post assembly and installation instructions are supplied with the canopy post bundles and are located in the support cup box Use these instruction...

Page 6: ...Midwest Industries Inc Ida Grove IA 51445 800 859 3028 www shorestation com 0003526 Page 6 REV A 4 12 06...

Page 7: ...Midwest Industries Inc Ida Grove IA 51445 800 859 3028 www shorestation com 0003526 Page 7 REV A 4 12 06...

Page 8: ...Midwest Industries Inc Ida Grove IA 51445 800 859 3028 www shorestation com 0003526 Page 8 REV A 4 12 06...

Page 9: ...Midwest Industries Inc Ida Grove IA 51445 800 859 3028 www shorestation com 0003526 Page 9 REV A 4 12 06...

Page 10: ...Midwest Industries Inc Ida Grove IA 51445 800 859 3028 www shorestation com 0003526 Page 10 REV A 4 12 06...

Page 11: ...Midwest Industries Inc Ida Grove IA 51445 800 859 3028 www shorestation com 0003526 Page 11 REV A 4 12 06...

Page 12: ...th the HA0007 Brace Bundle The assembly instructions are included with the brace bundles These brace bundles must be installed before the vinyl is placed on the frame INSTALLING THE VINYL COVER TO THE...

Page 13: ...frame to be adjusted a total of 1 1 2 shorter or 1 1 2 longer from its normal shipped position This allows you to ad just your frame to t the cover for length should it need adjusting The following in...

Page 14: ...ach Hdwe 22 24 26 108 1 68321 Canopy Brace Tube Alum Bundle 1 68345 Brace Box CF26 CF30 1 CF26 120N Bundle Number Description Quantity 69095 Side Frame Tube Bundle F30A 1 67166 Hoop Bundle F301 1 6909...