background image

Midwest Industries, Inc. 

Ida Grove, IA  51445 

800.859.3028 

www.shorestation.com 

0003526

Page 4 

 

 

REV A  4/12/06

Locate a No. 10 x ¾” self-drilling screw. Position the bottom 

edge of the canopy cord spool hook on the 10 ½” mark. Po-

sition so the spool of the molding is pointing directly down. 

Secure in this position by placing the self-drilling screw into 

the center hole of the spool, then drilling the screw in to attach 

it to the canopy bow.

Place  the  bottom  edge  of  the  second  canopy  cord  spool 

hook at the 7 ½” mark. Position so the spool of the molding 

is pointing directly down. Secure in this position by placing 

the self-drilling screw into the center hole of the spool, then 

drilling the screw in to attach it to the canopy bow. 

Measure and place a mark at 2” from the top of the 19” and 

the 16” canopy end spacer tubes. Locate a No. 10 x ¾” self-

drilling screw. Position the top edge of the canopy cord spool 

hook on the 2” mark. Position so the spool of the molding is 

pointing inward as shown. Secure in this position by placing 

the self-drilling screw into the center hole of the spool, then 

drilling the screw in to attach it to the canopy bow.

Repeat the above process on the other end hood assem-

bly.

FRAME ASSEMBLY INSTRUCTIONS

Locate the four 4” side frame tubes. Note that there are two

different lengths. Identify a smooth flat surface that they can 

be laid on during assembly because it makes the process 

much easier to accomplish. Measure and place a mark at 6” 

from one end of each of the side frame tubes. Loosen four 

of the stainless steel hose clamps large enough so they will 

slide over the side frame splice, Ref. 20 in Detail B. Mate the 

marked ends of a short and long side frame tube together.

Slide the splice onto the first side frame tube until it meets 

the 6” mark. Place the second side frame tube into the splice 

until the ends of the side frame tubes are touching each other. 

Note: The side frame tubes nudged together is very important 

because it adds considerable strength to the joint once it is 

fully assembled and tightened properly. The ends of the side 

frame tubes must be centered in the splice.

Repeat the process on the other side frame tube.

Tighten the stainless steel hose clamps evenly and securely 

around the side frame splice placing two of the clamps at 

the very ends of the side frame splice and one in the center 

of the splice where the ends of the side frame tubes meet 

inside the splice.

The  frame  is  easiest  assembled  when  it  is  assembled  on 

four sawhorses or something of this height. Place the two 

sideframe tubes on the sawhorses located at a spacing that 

is comparable to the width of the canopy once it is assembled. 

Place the two side frame tube assemblies so the splicers are 

directly across from each other (long side frame tubes are at 

same end of canopy). Insert the two end hood assemblies just 

assembled into the ends of the 4” diameter side frame tubes. 

This will properly space the tubes and keep them positioned 

while  the  balance  of  the  bows  are  assembled  to  the  side 

frames. Make sure the adjustable end hood assemblies are 

slid completely in and against the end of the side frame tube. 

Secure in this position by placing a stainless steel hose clamp 

around the side frame tube and also around the end hood 

tube stop weldment approximately 1” from the end of the side 

frame tube. Position the tightening mechanism on the clamp 

so it is located on the inside of the side frame tube and in a 

position that won’t interfere with the canopy cover when it is 

pulled around the side frame tube during installation. 

The canopy bows are to be spaced on 24” centers. Using 

a tape measure, place the first mark at 22”. Then mark The 

balance of the side frame 24” intervals the full length of the 

side frame tubes.

Locate the balance of the canopy bows. Slide two (2) each 

of the canopy cord spool hooks on each bow, then attach 

them to the side frames using the hoop mounting bracket 

loops provided.

Note that they have to be formed around the side frame tube 

when assembling. Align the hole in each end of the hoop 

mounting loop with the holes in the end of the canopy bow. 

Secure together using 1/4” x 2-1/4” carriage bolts and hex 

nuts. Thread on the nuts but do not tighten until instructed. 

Repeat the above process on all of the canopy bows. Once

they are all attached to the side frames, relocate them so they 

are on the 24” marks identified earlier.

Summary of Contents for ShoreStation CF24-120N

Page 1: ...ge 1 REV A 4 12 06 CF24 120N CF26 120N CF30 120N Canopy Frames Fitting Aluminum Hoist Models SSV30 40120 SSPV30 40120 SS30 40120 DW SSPV30 40120 DW SSV50120 SSV50120 DW Hydraulic Hoist Models SSV40120...

Page 2: ...Midwest Industries Inc Ida Grove IA 51445 800 859 3028 www shorestation com 0003526 Page 2 REV A 4 12 06 Diagram B...

Page 3: ...ows Locate one of the 19 canopy end spacer tubes Item 22 in Diagram B Detail E Attach it to the canopy bow that is laying at on the oor or ground at the center location just marked Secure together wit...

Page 4: ...ntered in the splice Repeat the process on the other side frame tube Tighten the stainless steel hose clamps evenly and securely around the side frame splice placing two of the clamps at the very ends...

Page 5: ...mes the framework assembly is now complete The canopy post assembly and installation instructions are supplied with the canopy post bundles and are located in the support cup box Use these instruction...

Page 6: ...Midwest Industries Inc Ida Grove IA 51445 800 859 3028 www shorestation com 0003526 Page 6 REV A 4 12 06...

Page 7: ...Midwest Industries Inc Ida Grove IA 51445 800 859 3028 www shorestation com 0003526 Page 7 REV A 4 12 06...

Page 8: ...Midwest Industries Inc Ida Grove IA 51445 800 859 3028 www shorestation com 0003526 Page 8 REV A 4 12 06...

Page 9: ...Midwest Industries Inc Ida Grove IA 51445 800 859 3028 www shorestation com 0003526 Page 9 REV A 4 12 06...

Page 10: ...Midwest Industries Inc Ida Grove IA 51445 800 859 3028 www shorestation com 0003526 Page 10 REV A 4 12 06...

Page 11: ...Midwest Industries Inc Ida Grove IA 51445 800 859 3028 www shorestation com 0003526 Page 11 REV A 4 12 06...

Page 12: ...th the HA0007 Brace Bundle The assembly instructions are included with the brace bundles These brace bundles must be installed before the vinyl is placed on the frame INSTALLING THE VINYL COVER TO THE...

Page 13: ...frame to be adjusted a total of 1 1 2 shorter or 1 1 2 longer from its normal shipped position This allows you to ad just your frame to t the cover for length should it need adjusting The following in...

Page 14: ...ach Hdwe 22 24 26 108 1 68321 Canopy Brace Tube Alum Bundle 1 68345 Brace Box CF26 CF30 1 CF26 120N Bundle Number Description Quantity 69095 Side Frame Tube Bundle F30A 1 67166 Hoop Bundle F301 1 6909...

Reviews: