Midwest Industries, Inc.
Ida Grove, IA 51445
800.859.3028
www.shorestation.com
0003526
Page 5
REV A 4/12/06
Check for square by using a tape measure or string.
Measure from one end of the side frame tube on one side of
the framework to the other side frame tube on the other side
of the framework.
Pull a tape measure or string from the opposite ends of the
canopy side frames across the framework as shown in the
above diagram.
CHECKING FOR CANOPY FRAME SQUARE
Diagram AA
Measurements A and B must match each other in order for
the framework to be square. If they don’t, slide one side frame
either forward or backward until matching measurements are
achieved. Once achieved, tighten all of the bolts attaching the
canopy bows to the side frames. the framework assembly is
now complete.
The canopy post assembly and installation instructions are supplied with the canopy post bundles and are located in the
support cup box. Use these instructions to attach the canopy posts to your hoist.
The following canopy post bundles are required to fit the following hoist.
Once the canpoy posts have been installed on your hoist continue to attach the canopy frame and vinyl as
follows.
Hoist Model
Canopy Post Required
Consists of Bundles
SSV30120
CP72D
68318, 68324
SSV40120
CP72D
68318, 68324
SSPV30120
CP72D
68318, 68324
SSPV40120
CP72D
68318, 68324
SSV30120DW
CP30D
68318, 68325
SSV40120DW
CP30D
68318, 68325
SSPV30120DW
CP30D
68318, 68325
SSPV40120DW
CP30D
68318, 68325
SSV40120HYD
CP72K
68317, 68331
SSV50120
CP72M
68318, 68330
CP90F
68318, 68327
SSV50120DW
CP32M
68318, 68329
SSV60120HYD
CP72H
68317, 68332
CP90H
68317, 67567
SSV60120HYD DW
CP32H
68317, 67320
SSV45120 (Steel Hoist)
CP42G
68320, 68328