Installation
*INSTALLATION*
38
Securing the machine
The tumble dryer must be secured to the floor by fitting the tension-
ing strips supplied over the machine feet.
Fittings supplied are for bolting the machine to a concrete floor. For
other types of flooring, please purchase suitable fastening materials
separately.
If the heat-pump unit is tilted up to a maximum of 30° during trans-
portation, it must be left to stand for at least one hour after it has
been installed before the heat-pump dryer can be operated.
If the heat-pump unit was tilted by an angle exceeding 30° or if it was
subjected to strong vibrations, the machine must be left to stand for
24 hours before commissioning.
After transportation and installation, downtime of at least one hour
is required before connecting the tumble dryer to the electricity
supply.
Insufficient downtime before commissioning can damage the heat-
pump.
Electrical connection
The electrical connection must be established by a qualified electri-
cian.
The electrical connection may only be made to an electrical system
provided in accordance with all appropriate local and national legisla-
tion, regulations and guidelines. Please also observe the regulations
set out by your insurance provider and energy supplier, accident pre-
vention regulations, as well as recognised codes of practice.
We recommend connecting the tumble dryer to the power supply
via a plug and socket so that it is easier to conduct electrical safety
checks (e.g. during maintenance or repair work).
Reliable and safe operation of this tumble dryer is only ensured if it
has been connected to the mains electricity supply.