Assemble the tower. Place the flange
plate of the tower onto the ceiling
plate in such a way that the spring
clips click into the slots securely.
Screw the flange plate firmly to the
ceiling plate with the M6 nuts, the
toothed lock washers and the flat
washers.
When doing this ensure that the
toothed lock washers are arranged
between the nuts (size M6) and the
underlying washers to guarantee
electrical safety.
Shorten the cable for electrical con-
nection as much as possible and se-
cure inside the cooker hood chimney
with the cable clips. Ensure all safety
regulations are complied with.
Finally, push the cover frame up-
wards until the spring fixing clips
click in securely and the frame lies
tightly against the ceiling.
Installation
23
Summary of Contents for DA 200
Page 27: ...27 ...