,
All electrical work must be
carried out by a qualified electrician
in accordance with local and
national safety regulations.
The machine is equipped with a 6 ft.
(1.8 m) long power cord, without a
plug. A plug, rated for the required
power which will fit the receptacle, is to
be supplied by the electrician doing the
installation. It should be connected to
the main power supply.
The receptacle should be accessible
after installation.
The machine must only be operated
with the voltage, frequency and fusing
shown on the data plate.
The machine can be converted
according to the converting diagram
and wiring diagram.
The converting diagram and data plate
are located on the rear of the machine
and on the plinth (behind the service
panel).
The wiring diagram is supplied with the
machine.
^
See the supplied installation diagram.
Contact Miele Technical Service for
more information.
A damaged power cord must only
be replaced with a genuine Miele
cord by a Miele service technician.
WARNING
THIS APPLIANCE MUST BE
GROUNDED
Remove the service panel and plinth
,
Disconnect the machine from the
main electrical supply.
^
Remove the fixing screws,
a
, from
the service panel.
^
Hold the service panel on both sides
and pull upwards.
^
Unscrew plinth facing (screws
b
).
^
Remove plastic protective cap.
Reassembling the service panel
^
Replace the plastic protective cap,
plinth facing and service panel in the
reverse order.
^
See the supplied installation diagram.
Electrical connection
58