OM-223 Page 17
200 VOLTS
Ref. S-174 976-A
230 VOLTS
460 VOLTS
1
230 VOLTS
Ref. S-174 973-A
575 VOLTS
460 VOLTS
2-9. Placing Jumper Links And Connecting Input Power
ST-800 103-A / Ref. ST-801 116
Check input voltage available at site.
1
Jumper Link Label
Check label
−
only one is on unit.
2
Jumper Links
Move jumper links to match input voltage.
3
Input And Grounding Conductors
Line Disconnect Device
Reed Switch (Ground Current Sensor)
(Optional)
6
Grounding Conductor
If unit is equipped with optional ground cur-
rent sensor, route grounding conductor
through reed switch two times and connect
to ground terminal.
Close access door.
3/8 in
3/8 in
IMPORTANT
GND/
3
PE
Connect GND/PE
Conductor First.
Input Contactor
L1 (U)
L2 (V)
L3 (W)
GND/PE
Earth
Ground
L1 (U)
L2 (V)
L3 (W)
3
4
Tools Needed:
5
6
2
380 VOLTS
400 VOLTS
440 VOLTS
Ref. S-174 975-A
220 VOLTS
(FACTORY OPTION)
Connect GND/PE
Conductor First.
Do not overtighten
jumper link nuts.