OM-2232 Page 21
SECTION 5
−
MAINTENANCE AND TROUBLESHOOTING
Y
Disconnect power
before maintaining.
.
Maintain more often
during severe conditions.
5-1. Routine Maintenance
3 Months
Replace
damaged or
unreadable
label.
Repair or
replace
cracked
cables.
Replace
cracked
torch body.
Repair or
replace cracked
cables and cords.
6 Months
Clean and
tighten weld
terminals.
Blow out
inside.
5-2. Blowing Out Inside of Unit
Y
Do not remove case when
blowing out inside of unit.
To blow out unit, direct airflow
through front and back louvers as
shown.
ST-801 718
Summary of Contents for Invision 456P
Page 4: ......
Page 31: ...OM 2232 Page 27 Ref 181 412 E...
Page 32: ...OM 2232 Page 28 Figure 6 2 Circuit Diagram For Welding Power Sources 575 Volt Models...
Page 33: ...OM 2232 Page 29 186 987 B...
Page 37: ...OM 2232 Page 33 Notes...
Page 38: ...OM 2232 Page 34 Notes...