Page 1 of 2
Installation Instructions
Plumbers, please ensure a copy of the Installation
Instructions are left with the end user for future reference
Milli Pure Wall Bath Hostess System
Tapware is to be installed by a Licenced Plumber in
accordance with AS/NZS 3500:2003
Recommended working water pressure 300 - 500 Kpa.
Maximum water temperature is 65 deg.C.
INSTALLATION GUIDE
Milli Pure Hostess System
April 2016
NOGGING
WALL
STUD
33 - 35
Wall Covering
25mm
"ROUGH-IN" View from above
90
Pipe Connections
SPINDLE
LOCK
FLANGE
SPINDLE
HANDLE
ADAPTER
HANDLE
ADAPTER
SCREW
OUTLET
IN-WALL BODY
MASTERFIT
THIS
SIDE
UP
AS/NZS 3718:2005
LIC. 20081
1/2" BSP
HOT
IN
OUTLET
22 - 35 mm
FIG.1A
1/2" BSP
COLD
IN
FIG.1
ROUGH IN PLUMBING (MASTERFIT)
MOUNTING GUIDE
- Prepare a nogging and secure 33 - 35mm back from the front of the
stud. (See Fig.1)
- The Masterfit (In-Wall) will be marked "This Side Up" to indicate orientation.
- Using the screws (x4) provided, mount the Masterfit (In-Wall) to the Nogging.
- Ensure the Masterfit is level and square to the Wall Studs.
PIPE CONNECTIONS
- The Masterfit is supplied with coloured thread Caps to protect and identify the Hot and Cold inlet connections.
- All lines must be free from any dirt and debris before connecting to the Masterfit. Flush all water feed lines.
- Connect Hot and Cold lines to the corresponding 1/2" BSP ports of the Masterfit. (See Fig.1A)
- Do not remove or disturb any factory fitted Pressure Plugs or Fixings.
- Once all water connections are made, use the “Spindle Handle Adapter” and check Hot/Cold water operation.
- Check all fittings and connections for leaks.
- Store the Dress Kit in a safe place until required for Fit off.
FITTING OFF
Prior to installing Dress kit, ensure 22 - 35mm of the Spindle and locknut protrude past the finished Wall surface. (See Fig.1)
If 22 - 35mm is not maintained then contact the manufacturer for possible options.
- Seal the wall around the Spindle and fit the Spindle Locking Flange to meet the Finished Wall Surface. (Fig.2)
- Screw “Cut-off” Gauge to the remaining threads of the Locknut. (See Fig.3)
- Using an appropriate saw, cut off the remaining thread against the “Cut-off” Gauge. (See Fig.4)
-
Important:
After cutting leave the Gauge in position and use a file to ensure the Spindle end is flat and square. (See Fig.4)
- Remove the “Cut-off” Gauge and de-burr any sharp edges from the inside of the locknut. (See Fig.5)
- Attach the Spindle Handle Adapter and ensure the Set screw engagement slot is positioned to the underside. (See Fig.5)
- Fit and tighten the Adapter Screw to secure the Spindle handle Adapter. (See Fig.6)
- Attach Handle to Spindle Handle Adapter. (See Fig.6)
- Align the Handle so that the Set screw locates into the engagement slot. (See Fig.7)
- Fine tune the Handle position and then tighten the Set Screw using a 2.5mm Allen Key. (Tighten well)
- Note the Handle should have 2 - 3mm clearance from the Finished Wall Surface.
- After completing the installation, establish water supply, check function of Tapware and ensure no water leaks.