Install the handwheel panel. Connect the 37-pin plug onto
the back side of the panel assembly. Be sure the connector
locks in place when the locking ring is turned. Fasten the
panel using the hardware provided.
Connect all remaining cables to their respective plugs on the machine.
Once the machine is in place and assembled this far, have the power and air supplies
connected by qualified personnel as described in chapter 1.
See the safety checklist on
page 2 for qualifications
.
Level the machine (rough level) in both side to
side and front to back directions.
Slide the flood coolant tank under from the rear of the machine.
Install the conveyor (if equipped)
30
Summary of Contents for ML Series
Page 2: ......
Page 4: ......
Page 6: ......
Page 20: ......
Page 23: ...CHAPTER 2 SPECIFICATION ML14 26 Series Machine Layout 17 ...
Page 24: ...ML35 40 Series Machine Layouts ML35 Series ML40 Series 18 ...
Page 33: ...CHAPTER 3 SITE PREPARATION 27 ML22 ML26 Lifting device drawing ...
Page 34: ......
Page 74: ......
Page 76: ......
Page 78: ......
Page 80: ......
Page 82: ......
Page 83: ......