C
HAPTER
6 - M
AINTENANCE
•
Change turret gear oil (if equipped).
Safety Checks, to be carried out monthly and after maintenance operations
•
Repeat the checks for correct operation of the emergency stop circuit and of the
safety enclosure circuit outlined in Chapter 4 of this manual.
•
In brief, power up the machine, enable the drives, and start the spindle. Verify
that pushing the red Emergency Stop button makes the spindle brake rapidly to a
stop and machine motion is halted.
•
Power up the machine, enable the drives, close the enclosure door, and start the
spindle. Hold in the SETUP button and pull open the enclosure door to verify
that the spindle brakes rapidly to a stop and machine motion is halted.
41
Summary of Contents for ML Series
Page 2: ......
Page 4: ......
Page 6: ......
Page 20: ......
Page 23: ...CHAPTER 2 SPECIFICATION ML14 26 Series Machine Layout 17 ...
Page 24: ...ML35 40 Series Machine Layouts ML35 Series ML40 Series 18 ...
Page 33: ...CHAPTER 3 SITE PREPARATION 27 ML22 ML26 Lifting device drawing ...
Page 34: ......
Page 74: ......
Page 76: ......
Page 78: ......
Page 80: ......
Page 82: ......
Page 83: ......