Initial Checks of the Machine, its Guards and Safety Systems
General Checks
1. Check for missing parts. Do not operate the machine if parts are missing.
2. Visually check for damage outside of machine and inside. Do not operate the
machine if there has been shipping damage.
3. Check to see that all necessary guards and safety switches are in place. Do not
operate the machine if necessary guards and safety switches are not in place.
Electrical Checks
Read and understand the following list of Electrical Safety Rules in Section 1 before
attempting to perform service on this equipment.
DANGER: Failure to observe these rules can result in death or serious injury.
•
Arc flash and shock hazard. Follow ALL requirements in NFPA 70E for safe
work practices and for Personal Protective Equipment before opening electrical
cabinet or performing adjustments or diagnostic measurements while
energized.
•
Only qualified personnel should attempt to take current and voltage readings or
perform service. See the safety checklist on page 2 for qualifications.
•
Always turn the main power off before servicing components within the
electrical cabinet.
•
Always keep hands and fingers away from live electrical terminals.
•
Remove jewelry while servicing the machine to avoid shorting any electrical
circuits.
•
Allow all components to discharge before servicing them. After removing
power, verify that the CHARGE LED indicator and 7-segment display on the
spindle drive have turned OFF before servicing.
1. Check for loose components or loose wires. With the main power disconnect OFF,
open the electrical cabinet door at the rear of the machine. Visually check if any
components or wires came loose during shipment. Do not operate the machine if
they did. Find qualified personnel as described in chapter 1 to correct the problems.
33
Summary of Contents for ML Series
Page 2: ......
Page 4: ......
Page 6: ......
Page 20: ......
Page 23: ...CHAPTER 2 SPECIFICATION ML14 26 Series Machine Layout 17 ...
Page 24: ...ML35 40 Series Machine Layouts ML35 Series ML40 Series 18 ...
Page 33: ...CHAPTER 3 SITE PREPARATION 27 ML22 ML26 Lifting device drawing ...
Page 34: ......
Page 74: ......
Page 76: ......
Page 78: ......
Page 80: ......
Page 82: ......
Page 83: ......