Chapter 3. Routine Maintenance
PELLERIN MILNOR CORPORATION
Chapter
3
Routine Maintenance
BIUUUM09 (Published) Book specs- Dates: 20120626 / 20120626 / 20130207 Lang: ENG01 Applic: MXA
3.1.
Routine Maintenance—30-series, Rubber Spring-hung
Washer-extractor
This document uses Simplified Technical English.
Learn more at http://www.asd-ste100.org.
Do the maintenance in
Section 3.1.2 “Maintenance Summary”
to make sure that the machine is
safe, keeps the warranty, and operates correctly. This will also decrease repair work and
unwanted shutdowns. Speak to your dealer or Milnor if repairs are necessary.
WARNING 20 : Risk of severe injury
—Mechanisms can pull in and mutilate your body.
• You must be approved by your employer for this work.
• Use extreme care when you must examine components in operation. Remove power from
the machine for all other work. Obey safety codes. In the USA, this is the OSHA
lockout/tagout (LOTO) procedure. More local requirements can also apply.
• Replace guards and covers that you remove for maintenance.
3.1.1.
How To Show the Maintenance On a Calendar
If you use software to keep the maintenance schedule for your plant, add the items in
to that schedule. If not, you can put marks on a calendar that work with the tables in
. The marks are the numbers 2, 3, 4, 5, and 6. It is not necessary to show the number 1 (items
you do each day) on the calendar. The number 2 = items you do each 40 to 60 hours, 3 = each
200 hours, 4 = each 600 hours, 5 = each 1200 hours, and 6 = each 2400 hours. These are the
"Mark" numbers at the top of the narrow columns on the left of each table in
shows where to put the marks on a calendar. For example, if your machine operates
between 41 and 60 hours each week, the first three marks are 2, 2, and 3. Put these marks on the
first, second, and third weeks after the machine starts operation. If you do routine maintenance on
a given day of the week, put the mark on that day of each week. Continue to put marks on the
subsequent weeks.
It can be necessary to do the 40 to 60 hour (2) maintenance more than one
time each week.
If the machine operates between 61 and 100 hours, put a 2 on two days of the
week. If the machine operates 101 or more hours, put a 2 on three days of the week.
On each date with a 3, do the items with an x in the 3 or the 2 column of each table in
3.1.2
. On each date with a 4, do the items with an x in the 4, 3, or 2 column. Continue this
20
Summary of Contents for 30 Series
Page 2: ......
Page 4: ......
Page 5: ...English 1 1 ...
Page 6: ......
Page 8: ...Applicable Milnor products by model number 30022X8J 30022X8W 4 ...
Page 39: ...Deutsch 2 35 ...
Page 40: ......
Page 42: ...Gilt für die Milnor Produkte mit den folgenden Modellnummern 30022X8J 30022X8W 38 ...
Page 73: ...Dansk 3 69 ...
Page 74: ......
Page 76: ...Gældende Milnor produkter ifølge modelnummer 30022X8J 30022X8W 72 ...
Page 107: ...Nederlands 4 103 ...
Page 108: ......
Page 110: ...Toepasselijk Milnor producten op modelnummer 30022X8J 30022X8W 106 ...
Page 141: ...Português 5 137 ...
Page 142: ......
Page 144: ...Pode ser aplicado Milnor produtos por número do modelo 30022X8J 30022X8W 140 ...
Page 175: ...Español 6 171 ...
Page 176: ......
Page 178: ...Productos aplicables de Milnor por número de modelo 30022X8J 30022X8W 174 ...