After assembling the fixed scroll to the casing, turn the shaft by hand to confirm the smooth rotation of the shaft.
⑤
Measure the torque of the shaft
After installing the fixed scroll, measure torque of the shaft.
Coil a piece of string around the pulley and then connect a spring balance to the another end of the string and then turn the
pulley more than one complete turn by pulling the spring balance. Take a measurement of the spring balance, and calculate
the average.
Model
Torque of the Shaft [Unit:1Kg]
15SP1CB/ 13SP2CB - 35SP1CB/ 29SP2CB
52SP1CB / 42SP2CB
Less than 2.2 Kg
If the rotation is hard at fixed angle during measuring the torque or rotation by hand, there is a possibility of misalignment.
In this case, the air-end must be replaced.