MINIVAC 1/2/3 PS & ARICA
520713-00
12
EN
Case n°2
High pressure stop (-820 or -870 mbar)
FLEXO time (8 minutes)
Start-up (-650 mbar)
Motor stop (-750 mbar)
On
Off
End of FLEXO time
During the FLEXO time, if the pressure drops below the "Stop Motor" threshold, the vacuum pump is not
stopped.
At the end of the FLEXO time, if the pressure is below the "Stop Motor" threshold, the vacuum pump is
stopped.
Case n°3
High pressure stop (-820 or -870 mbar)
FLEXO time (8 minutes)
Start-up (-650 mbar)
Motor stop (-750 mbar)
On
Off
During the FLEXO time, if the pressure reaches the "High pressure Stop" threshold, the vacuum pump is
stopped. It means that the consumption flow of the establishment is limited.
CHOICE OF ROOM
The unit must be located in a clean, non-humid, non-saline, dustless and ventilated local whose the
temperature should be b5C and +40C.
Forced ventilation controlled by a thermostat must be installed to ensure adequate room ventilation.
The following formula can be used to size the fan:
∆ °
∆ °
With:
Q
= Ventilation volume (m³/h)
P
= Compressor energy consumption (kW)
ΔT
= Temperature difference between the local and outdoor
1250
= Volumetric heat capacity Cp (J.m³.K
-1
)
Example : Vacuum pump power 16.5 kW
ΔT
eligible = 10°C
.
/
The air inlet area must be dimensioned such that the flow rate does not exceed 3 m/s.
(Extreme tolerance of 5 m/s).
.
²
For information purposes, the table below gives the amounts of heat that must be extracted, according to
the installed capacity in kW
Total
installed
capacity
Heat released
Ventilation of room
Ventilation
flow rate
m³/h
Air inlet area
of 3 m/s
(m
2
)
kW
kW/h
kJ/h
Th/h
kCal/h
5
5.22
18792
4.3
4300
1440
0.14
10
10.45
37620
8.6
8600
2880
0.28
15
15.67
56512
12.9
12900
4320
0.42
20
20.90
75240
17.2
17200
5760
0.56
25
26.12
94032
21.5
21500
7200
0.7
30
31.35
112860
25.8
25800
8640
0.84
The person in charge of the installation has overall responsibility of the product environment requirements.
He is also in charge of setting up methods of struggle against fire and to protect vacuum units against shocks,
flooding, earthquake and corrosion.
The technician or exploiting is responsible for building construction and civil engineering infrastructures or
earthwork.
Outdoor deadline pressure (snow, wind, rain..) must be taken into account.
Environmental constraints must be managed.
According to the standards NFS99-175 (§ 5-7-3), ISO 10083, ISO 7396-1 (§ 5-8) vacuum units must not be in
the same room as O
2
concentrator, gas bottles and non-cryogenic liquid.