- xiii -
Structure of this Operation manual
This manual consists of the following seven chapters to describe the handling of the device.
Chapter 1 Name and Function of each section
This chapter describes the name and function of the device.
Chapter 2 Operations
This chapter describes a series of operations and settings, ranging from
power-on to end of plotting.
Chapter 3 Daily Cleaning
This chapter describes the replacing the waste ink tank and the cleaning
procedure for each section.
Chapter 4 Setting Function
This chapter describes the setting function.
Chapter 5 Maintenance Functions
This chapter describes the maintenance functions and how to replace a
wiper.
Chapter 6 When abnormal conditions are encountered
This chapter describes how to correct troubles after the occurrence of an
abnormal condition on the device.
Appendix
The specifications of this device, inquiry sheet and operation flow are
included.
Summary of Contents for GP-604D
Page 2: ......
Page 18: ...xiv...
Page 54: ...2 24...
Page 80: ......
Page 106: ...5 26...
Page 122: ...A 6...
Page 133: ......