4. Device installation | 4.2 - Mechanical preparation | 32
–
Establish a low-resistance connection between the screen clamping rail
and the cabinet/housing.
–
Use a metallic or metalized connector housing.
–
Establish equipotential bonding between devices/system components
(this is essential for Ex applications).
–
Use a standardized reference potential.
–
Connect the mounting rail to protective ground.
–
Keep measurement and data cables away from power cables.
Pos.
Name
1
Mounting rail (35 mm)
2
Rail connector (e.g. Phoenix AB-SK 65D)
3
Screen clamping rail (e.g. Phoenix NLS-CU 3/10)
4
Screen clamp (e.g. Phoenix SK8-D)