4.5.8
Connecting 2
4 load cells via PR 5230/22 load cell junction board
The PR 5230/22 load cell junction board for 2 to 4 load cells, which is available as an
accessory, can be used instead of a cable junction box.
This is an advantage, if the PR 5230 is installed in the immediate vicinity of the load cells
and the load cell cables are long enough for connection.
The load cell cables are passed through the metal cable glands.
4 Device installation
Transmitter in field housing PR 5230
EN-69
Minebea Intec