32
Bag 2 Completed Assembly
• Thread one MA0331 ball link from bag 2 Slide the MA128-142 T/R control rod from bag 2a through all three of the T/R control
rod guides. Make sure they are aligned so that there are no bends in the T/R control rod. Thread on the other MA0133 ball link. It is
important to align the T/R control rod guides so that they are positioned approximately 152mm from the ball links. Simply position the
center T/R control rod guide evenly between the two outer T/R control rod guides.
Illustration 2i
0133
2X
128-142
Summary of Contents for X-Cell Furion 6
Page 1: ...ASSEMBLY INSTRUCTIONS Step up to Excellence with X cell...
Page 2: ...2...
Page 23: ...Bag 1 Completed Assembly 23...