45
In this step, you will attach the completed main rotor assembly to the main shaft. Refer to Illustration 4f for this step.
• Install the rotor head assembly onto the main shaft. Note that there is a 3mm hole in the main shaft. This must be lined up with the
hole in the head block. Insert the MA128-198 dowel pin from bag 4c into the head, and through the 3mm hole in the main shaft.
• Thread in an MA0057 m4x4 socket set screw into the head block to capture the MA128-198 dowel pin as shown.
• Thread in the two MA0063 m3 x 10 socket bolts into the head block as shown, when tightened, these socket bolts provide clamping
force onto the main shaft.
Illustration 4f
0063
0057
128-198
0063
FLYBAR RODS AND LINKS
REMOVED FOR CLARITY
Apply a small amount of
medium thread lock when
threading into metal parts
Summary of Contents for X-Cell Furion 6
Page 1: ...ASSEMBLY INSTRUCTIONS Step up to Excellence with X cell...
Page 2: ...2...
Page 23: ...Bag 1 Completed Assembly 23...