23
4.1 Access to terminal block
Access to terminal block: remove the 2 screws of the terminal block
cover
Figure 22. PDU of 6K/10K
4.2 Common input sources connection
CAUTION:
This type of connection must be carried out by qualified electrical
personnel
CAUTION:
Always connect the earthing wire first
Summary of Contents for 6-10KVA Tower
Page 1: ...USER MANUAL ONLINE UPS 6 10KVA Rack Tower ...
Page 24: ...21 Frequency converter without Bypass AC input ...
Page 31: ...28 Figure 26 Parallel systerm wiring diagram of 6K 10K ...
Page 40: ...37 Fig 5 14 Main menu tree ...
Page 47: ...44 Example set rated output voltage value Fig 5 22 Set rated output voltage value ...
Page 61: ...58 614 08090 00 ...