AC FUSE

1.  Remove the UPS from the shipping box and set on the floor or a bench top. 
2.  Remove the cover screws. 
3. Remove 

the 

cover. 

4.  Verify that the voltage and frequency ratings match that of the Utility power, and then connect the AC Input power 

cord into a two-pole, three-wire grounded receptacle only.  Do not use extension cords, adapter plugs, or surge strips. 

5.  Wait for approximately 10-seconds until the Green Utility LED (#6) on the front panel turns on. 
6.  Connect the Battery Negative (Black) wire to the Battery Negative terminal. 
7.  Disconnect the UPS’s AC Input power cord from the wall outlet. 
8. Re-install 

the 

cover. 

9.  Re-install the cover screws. 
10. Plug the equipment into the output receptacles on the rear panel of the UPS.  Do not use extension cords, adapter 

plugs or surge strips on the output of the UPS.  Ensure that the load does not exceed the maximum output rating of 
the UPS (refer to the information label on the UPS or the Electrical Specifications in the User’s Manual). 

11.  Plug the UPS’s AC Input power cord into the wall outlet. 
12.  Press the Main switch on the front panel to turn on the UPS.  The fan on the rear panel will start. 
13. After 7~10 seconds, the start-up of UPS will be completed, then the "Utility" LED and Inverter" LED will illuminate 

simultaneously. 

14.  Turn on the connected equipment. 
15. Press and hold the Test/Alarm Silencer Button for 10-seconds to perform a Self-Test to verify proper operation of the 

UPS. 

16. The installation is complete the UPS is ready for normal operation.  See the UPS User’s Manual for more detailed 

information. 

 

CPE 1000, CPE 1000i, CPE 1000PP

 

 

 

CPE 2000, CPE 2000i, CPE 2000j

 

 
 

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 