B-
From Battery
B+
From Battery
B+
Controlled
B-
Controlled
25 Volts
Digital Volt Meter
18. Testing the Main Power Relay on the E17, E20 and
E26ECO
Note: Measure the voltage from the battery positive
source to the B- terminal of the main relay’s coil to
determined of the B- is being supplied to the coil.
It should be 24 volts.
+
-
-
+
Batteries
OR
Page 56
Summary of Contents for E17BD
Page 6: ...2 Technical Specifications E17BD E20 Page 6 ...
Page 7: ...2 1 Dimensions E17BD E20 BD With a Straight Squeegee Page 7 ...
Page 8: ...2 2 Dimensions E17 E20 With Curved Squeegee Page 8 ...
Page 11: ...3 2 Minuteman System Maintenance I Page 11 ...
Page 12: ...3 3 Minuteman System Maintenance II Page 12 ...
Page 13: ...3 4 Minuteman System Maintenance S Page 13 ...
Page 39: ...11 Squeegee Curved 11 Page 39 ...
Page 40: ...11 Squeegee Curved 11 1 Page 40 ...
Page 52: ...17 1 Solution Filter Version 1 17 1 Page 52 ...
Page 64: ...20 Notes Page 64 ...