19.4 Testing the Drive System Potentiometer
5 K
5K Fixed Value
Does not
change while
turning shaft
Fig. 1
5 K
5K to 0K
Variable
Resistance
Adjust shaft
while testing
Fig. 2
5 K
0 to 5K Variable
Resistance
Adjust shaft
while testing
Fig. 3
1. Disconnect the potentiometer from circuit
2. Use ohm meter (preferably an analog type) to measure the resistance across the
two outside terminals (Fig. 1). It should measure 5K (5,000 ohms +/- 20%)
3. Measure the resistance from the center terminal to each outside terminal.
Fig. 2 and Fig. 3) The resistance should show a smooth change while turning the
shaft on each.
Page 63
Summary of Contents for E17BD
Page 6: ...2 Technical Specifications E17BD E20 Page 6 ...
Page 7: ...2 1 Dimensions E17BD E20 BD With a Straight Squeegee Page 7 ...
Page 8: ...2 2 Dimensions E17 E20 With Curved Squeegee Page 8 ...
Page 11: ...3 2 Minuteman System Maintenance I Page 11 ...
Page 12: ...3 3 Minuteman System Maintenance II Page 12 ...
Page 13: ...3 4 Minuteman System Maintenance S Page 13 ...
Page 39: ...11 Squeegee Curved 11 Page 39 ...
Page 40: ...11 Squeegee Curved 11 1 Page 40 ...
Page 52: ...17 1 Solution Filter Version 1 17 1 Page 52 ...
Page 64: ...20 Notes Page 64 ...