12. Usage
MiR1000 Shelf Lift User Guide (en) 12/2020 - v.2.1 ©Copyright 2019-2020: Mobile Industrial Robots A/S.
208
3.
Select
Continue
to start the mission.
4.
Watch the robot execute the mission, and verify that it performs as expected.
We recommend running the mission 5-10 times to ensure that it runs
smoothly. If something interrupts the mission, use a Try/Catch action in that
step of the mission and decide what the robot has to do if a mission action
fails.
WARNING
If the robot is docking to a shelf and has partly muted the Protective field sets,
personnel positioned between the shelf and robot risk being trapped or
crushed.
•
Ensure that docking positions are clearly marked as operating hazard zones
with visible tape or similar marking and that all personnel are instructed
not to stand close to the robot when it is docking.