11
Section
7
Installation Requirements
1. Plumbing
Read the section
“Important Safety Information”
first
1.1.
The Elite 2 is designed to operate with water supply pressures from 0.008
bar (80 millimetres head) to 1 bar (10 metres head) (i.e. the vertical
distance from the base of the cold cistern to the top of the Elite 2).
However, the minimum head required will increase with pipe length and the
guide given in paragraph 1.17. should be used to ensure that adequate
head is available for any given installation.
The Elite 2
MUST
have its own separate supply from the cistern.
Incorrect Cistern Take Off
Debris from the bottom of the
cistern and air generated when
the cistern refills will enter the
shower supply.
Correct Cistern Take Off
Positioned away from the ball
valve, with a 25 mm distance up
from the base of the cistern.
This connection will prevent air
and debris entering the shower
supply.
25 mm
1.2.
The Elite 2 is suitable for installation within the shower area and is fitted
with a pressure relief valve. It must be positioned over a water catchment
area with the controls at a convenient height. The shower fitting should be
positioned so that it discharges down the centre line of the bath, or across
the opening of a shower cubicle, and must be directed away from the
shower unit.
1.3.
Use a minimum of 15 mm diameter supply pipework. It should be noted,
however, that on long pipe runs this should be increased to 22 mm (refer to
para 1.17. for guidance). When using flexible plastic pipe it is essential that
the pipe is kept flat and not looped up at any point as this may lead to air
build up which may impair performance of the shower.
25 Gallon/113 Ltr Cistern.