5
1115815-W2-C
InsTallaTIon
General
1.
Care should be taken when drilling into walls and floors to avoid any hidden
pipes or wires.
2.
We strongly recommend that all glass panels are moved by a minimum of two
people and that any protective packaging along the glass edges is kept in place
for as long as possible to prevent damage before installation.
3.
People not familiar with the fitting of Mira enclosures may require the assistance
from another person at certain stages of the procedure. We have indicated
these points in the installation procedure with a caution symbol.
4.
Wear protective footwear when lifting panels.
5.
Wear safety glasses when drilling.
saFeTy PreCauTIons
1
(a)
For Bi-fold Door only
- Remove the transit clamps and fit the small rubber
plugs where the transit screws had been fitted.