Step 4
Mark and drill (6) 3/8"
FP
holes in concrete pad. Holes
can be drilled directly thru the tank holes at an angle
and then anchors can be driven into place also.
Step 1
Attach the 200 psi
EDU
hose with shutoff valve to
the PVC elbow, use tef
OR
n tape on all threaded
IL
t
WLQJV
.
Step 2
Set the entire assembly into the valve cradle.
Step 3
Place the stainless steel bracket over the PVC
ILWWLQJV
and attach with 1/4"
FP
stainless steel screws
Step 5
After inserting 3/8" x 4"
FP[FPDQFKRUEROWV
(provided), set tank over the bolts and install nuts and
tighten.
Step 6
Attach f
OR
at assembly and adjust water level to
desired height.
provided.