4
The company reserves the right to change models and specifications without notice.
We want you to be completely satisfied with our products and service. If you have any comments or
suggestions, please call
toll free.
1-800-MIROLIN
STEP 8: Finish the installation by running a bead of high
quality silicone around the outside of the bathtub, where
the bathroom floor meets the bathtub apron.
STEP 7: Lift the tub back into the correct position,
levelling the tub if necessary (tub levelled at factory).
Level by loosening the hex nut and threading the rod into
or out of the block. Tighten the hex nut against the wood
block once the foot is level. Connect the plumbing once
the tub is level.
HEX NUT
ROD
R0084013
05 Jan. 2016
INSTALLATION NOTES
TESTING
Test the installation after completing the plumbing, but before enclosing the bath and finishing the surroundings.
Fill the bath with water and leave it for one hour to ensure that the adjustment of the drain-overflow assembly is correct, and
that there are no leaks.
Mirolin Industries Corp. will not be liable for any kind of damages as a result of not water testing the unit prior to use by end
user.
Mirolin Industries Corp. is not responsible for any damages incurred as a result of poor installation of the product.