background image

mirolin.com

Sable

TM

Read all instructions 

carefully 

before proceeding

  

OWNER’S

MANUAL

CF 2012

For ALL Installation & Product Related Inquiries
Contact 

Mirolin

 Customer Care at 800.MIROLIN

Please Do Not Contact Retailer.

baths for this generation and the next

                         Mirolin Industries Corp

 

         

60 Shorncliffe Road, Toronto, ON M8Z 5K1

   T: 416.231.5790           800.MIROLIN(647-6546)
   F: 416.231.0929                            800.463.2236

©

 

2018 Mirolin Industries Corp.  

INSTALLATION  INSTRUCTIONS

2 Piece Freestanding Tub

Summary of Contents for Sable CF 2012

Page 1: ...nquiries Contact Mirolin Customer Care at 800 MIROLIN Please Do Not Contact Retailer baths for this generation and the next Mirolin Industries Corp 60 Shorncliffe Road Toronto ON M8Z 5K1 T 416 231 579...

Page 2: ...tomer Care is available 8am to 5pm EST Monday to Friday Call Mirolin Customer Care at 800 MIROLIN 647 6546 Email Mirolin Customer Care at support mirolin com mirolin com Your User Friendly On line Mir...

Page 3: ...part bathing well from the apron section as shown STEP 2 Position the tub in the area where it will be installed Unscrew the drain pop up and mark drain location MARK DRAIN LOCATION STEP 6 Reassemble...

Page 4: ...ex nut against the wood block once the foot is level Connect the plumbing once the tub is level HEX NUT ROD 4 R0084050 31 Aug 18 C US We want you to be completely satisfied with our products and servi...

Page 5: ...stries Corp 60 Shorncliffe Road Toronto ON M8Z 5K1 T 416 231 5790 800 MIROLIN 647 6546 F 416 231 0929 800 463 2236 Des baignoires pour la g n ration actuelle et aussi la prochaine Pour TOUTES les dema...

Page 6: ...le de 8H00 18H00 HNE du lundi au vendredi Appelez le Service la client le de Mirolin au 800 MIROLIN 647 6546 Faites parvenir un courriel au Service la client le de Mirolin support mirolin com mirolin...

Page 7: ...e de la jupe tel qu illustr tape 2 Positionnez la baignoire l endroit o elle doit tre install e D vissez le clapet du drain et marquez le positionnement du drain tape 6 R assemblez l int rieur de la b...

Page 8: ...le bloc Resserrez l crou hexagonal contre le bloc de bois quand le pied est de niveau Raccordez la plomberie quand la baignoire est de niveau CROU HEXAGONAL TRINGLE 4 R0084050 31 Aug 18 C US 60 Shorn...

Reviews: