background image

Z14

Z15

Z16

(Z17)

Z13

PE2

PE3

PE4

Z19

Z18

0,6mm wire

Z27

“BB”

E5

E4

“HH”

Dry-fit “HH” into crossbeam opening first, glue engine in its place 
and then  glue “HH”                with engine 

Assemble front axle

PE15 (PE14)

F18
F10

F12

F10

“FF”

F12

F10

Z8+Z9

cut length of Z8 rod  if needed 

5

Summary of Contents for Ford F15A

Page 1: ...ign the Battle of the Philippines 1941 42 the liberation of Northwest Europe and the Western Allied invasion of Germany CMP trucks also saw service in post war conflicts in Indonesia French Indochina...

Page 2: ...F11 A11 A12 A9 A10 A2 A7 A8 A7 A15 A3 A4 A13 A14 Z3 Z2 A1 A5 A6 0 6mm wire strip of tape used for belt 0 3mm wire lengths use lengths of 0 3mm wire to connect hinges and create true looking appearanc...

Page 3: ...33 E31 E30 E32 H1 H9 H11 H10 H20 H23 E27 PE5 PE6 push all rivets from back PE7 PE8 PE9 H4 H3 H22 H21 C1 PE10 PE11 H5 H6 H7 PE12 E13 Z22 Z23 Z24 H18 H19 H8 C2 F17 F17 F9 E7 E6 H17 H16 3 PE19 PE20 F17 P...

Page 4: ...D2 D1 D3 D3 D7 D7 REAR AXLE FRONT AXLE D4 D4 D11 D11 MIND DIRECTIONS OF PARTS 0 5mm wire 0 5mm wire PE13 PE13 D14 D10 D10 B3 B4 B11 B6 B9 B9 for this truck variant assemble B6 in slots located furthe...

Page 5: ...PE4 Z19 Z18 0 6mm wire Z27 BB E5 E4 HH Dry fit HH into crossbeam opening first glue engine in its place and then glue HH with engine Assemble front axle PE15 PE14 F18 F10 F12 F10 FF F12 F10 Z8 Z9 cut...

Page 6: ...DD left CC EE Z6 Z5 Z7 Z7 cut Z5 Z6 Z7 to length needed remove H26 C3 PE6 F3 F4 F5 F7 fill this hole on B1 B2 close up look on assembly repeat on the right side F15 6 PE17 PE18 W34 W34 to correspond w...

Page 7: ...les available at http www german o5m6 de Markings see dashboard above and examples on next page Part list 1x various parts Z 1x body parts G 1x Cab11 parts H 1x clear parts parts C 1x engine parts A 1...

Page 8: ...Canadian service German service British service 8...

Reviews: