SHENZHEN MISENSE COMMUNICATION TECHNOLOGY CO., LTD.
WWW.MISENSECOM.COM
Page 6/16
On: The first port connected to ONU
PON1 LINK1 Green
Off: The first port not connected to ONU
On: The second port connected to ONU
PON1 LINK2 Green Off: The second port not connected to
ONU
Table 1 the discription of indicator lights of panel
1.3
Size and weight
Size: 441mm*192mm*43mm
Weight: about 3kg
2
Equipment installations
2.1
Installation enviroment
Installed in the center room on the rack.
2.2
EPON Port connection
First install the OLT SFP optical module, and after
installing the optical module, insert SC/PC fiber to SFP optical
mode, and the process is completed.
Note: Keep the joint of fiber clean, and please preserve
the cap of flange for later use.