2.3 Notes for using
3.2 Status Indicator
3. Operation Interface
3.1Interface View
1. Inverter should be installed and maintained by qualified person under local
standard regulations.
2. It must disconnect the AC side first, then disconnect DC side before doing
installation and maintenance, after disconnecting, please wait at least 5 mines
to avoid get shocked.
3. Local temperature of the inverter may exceed 80 ℃ while under operating.
Do not touch to avoid get injured.
4. All electrical installation must accord with local electrical standards, and after
obtaining the permission of the local power supply department, the
professionals can connect the inverter to the grid.
5. Please take appropriate anti-static measure.
Pic 3.1 Panel
6. Please install where children can not touch.
8. Don’t insert and remove AC and DC terminals when the inverter is in
normal operation.
9. The DC input voltage of the inverter must not exceed the maximum input
voltage of the model.
The inverter panel has 4 indicators, the left one is DC output indicator(green),
indicates normal DC input power status. Beside is the AC indicator(green),
indicates normal AC connecting status. Next is the operating indicator(green)
indicates normal output. The right indicator is alarm(red), indicates alarming.
7. When starting the inverter, first close the closed-circuit grid-side switch and
close the DC input terminal; when closing the inverter, disconnect the
grid-side switch first and then disconnect the DC-side switch.
The three phase string power inverter is designed and tested under related safety
regulations. It can ensure the personal safety of the user. But as a electric device,
it may cause shock or injury by incorrect operation. Please operate the unit
under below requirements:
- 5 -
- 6 -
AC
DC
Alarm
Normal