Inverter should vertically installed, as shown in pic 4.5,installation procedure
show below:
1. Position the bolts on the appropriate wall according to the bolt positions on
the mounting shelves and mark the holes. On the brick wall, the installation
must be suitable for the expansion bolt installation.
2.Ensure that the position of the installation holes on the wall (A, B, C, D)
are the same position of the install plate (figure 4.5), and the mounting level
is guaranteed.
3. Hang the inverter to the top of the mounting rack and then use the M4 screw
in the accessory to lock E and F (figure 4.6) to ensure that the inverter does not
move.
Inverter has considered the convenience of the electrical connection while designing.
we design fast connection for both DC and AC ,all electrical connections conform to
related standards of the country .
In order to safe connection, the electrical connection must follow below
steps:
1. Switch AC off
2. Switch DC off
3. Connect the inverter to solar panels
Pic4.5 Inverter hanging plate installation
Pic4.6 Mounting of inverter
5.1 DC input terminal connection
5 Electrical Connection
- 11 -
- 12 -