7.3.3.7 Run-in test
When select the item, DM will load Runin.txt file then do the test, which file assigned. The DM will follow the
requirement of the file to do the test. PE can modify the file to select the test items and test time or test cycle and set
the time to check the batter capacity. Below is the format of the file:
The sum of test item: 3
The hours of test: 0
The cycle of test: 2
The time (min) to check battery: 90
Below is the test item :
2
3
5
Define the hour of loop cycle
Define the times of loop cycle
Set the time to check the battery capability