13
10
10.5
[Fig. 10.5]
A
G
C
J
K
I
H
B
L
F
I
D
E
A
: Position the edge of the supplied paper with mark at the
edge of the pipe cover.
Then, wind the sealing material to the pipe, using the
mark on the paper to properly align it.
B
([WHQGWKH¿HOGVXSSOLHGLQVXODWLRQDOOWKHZD\WRWKHHQG
of the sealing material described in step A.
C
: Install the water stopper at the end face of the insulation.
D
: Mark
E
: Install the sealing material so that the edges of the mate-
rial meet at the top.
F
: Inside the unit
G
: Pipe cover
H
: The seam of the insulation should be at the top.
I
: Sealing material for water stopper
J
: Install the water stopper so that the slit of the water stop-
per is at the top.
K
: Water stopper
L
6HDOLQJPDWHULDOIRU¿HOGSLSLQJ
10.6
[Fig. 10.6]
A
G
C
J
K
I
H
B
L
M
J
F
I
D
E
K
A
: Enlarged view
B
: Sealing material attachment process
C
3URFHVV$WWDFKWKHVHDOLQJPDWHULDOIRUEDVHOHJ
D
3URFHVV$WWDFKWKHVHDOLQJPDWHULDOIRUEDVHOHJ
E
3URFHVV$WWDFKWKHVHDOLQJPDWHULDOIRUZDWHUSDQHO
RQO\ULJKWIURQW
F
: Panel assy W
G
2QO\VHDOLQJPDWHULDOVIRUEDVHOHJ
H
6HDOLQJPDWHULDOVIRUEDVHOHJDQGVHDOLQJPDWHULDO
IRUZDWHUSDQHO
I
6HDOLQJPDWHULDOIRUEDVHOHJ
J
6HDOLQJPDWHULDOIRUEDVHOHJ
K
6HDOLQJPDWHULDOIRUZDWHUSDQHORQO\ULJKWIURQW
L
: Put sealing material inward.
M
: Match the end face.
Summary of Contents for CITY MULTI PQHY-P-TLMU-A
Page 55: ......