GB-50
WT08432X01
10-5-2. Fixing the cables in place
Route the cables as shown in the figures below.
・
(E)P200 to 300
・
(E)P350 to 550
Fill the gap.
Rubber bushing
(for main inverter connection
wiring (200 V) and unit wiring
(solenoid coil wiring))
Inverter Box
Main Box
Cable strap
Tie band
(Supplied)
Rubber bushing 1
Transmission terminal block
Main inverter
connection wiring
(low voltage)
Transmission cable (not supplied)
The length of the section after the cable
access hole must be at least 1100 mm (43 in).
Power supply terminal block
Power cable
(not supplied)
Rubber bushing 2
Tie band
(Supplied)
Unit wiring (sensor wiring)
Rubber bushing
(for FAN cable)
Rubber bushing
(for Fan cable and unit wiring
(solenoid coil wiring))
Cable strap
Tie band
(Supplied)
Rubber bushing 1
Transmission terminal block
Transmission cable
(not supplied)
Power supply terminal block
Power cable
(not supplied)
Rubber bushing 2
Tie band
(Supplied)
Unit wiring (sensor wiring)
Fill the gap.
Summary of Contents for City Multi R2 Series
Page 2: ......
Page 62: ...GB 60 WT08432X01 ...