I
CONTENTS
1.1 Pre-operation instructions ..................................................................2
1.2 Converter and peripheral devices.......................................................7
1.3 Precautions for selecting peripheral devices ....................................8
2.1 Removal and installation of the converter (FR-HC2) front cover.....16
2.2 Removal and installation of the outside box (FR-HCB2) front
2.4 Protruding the heatsink..................................................................... 21
2.5 Installation of peripheral devices .....................................................23
Installation of the outside box (FR-HCB2-7.5K to 75K, FR-HCB2-H7.5K to H220K) ................... 24
Installation of MC power supply stepdown transformer (FR-HCM2-H280K to H560K) ................ 26
2.6 Main circuit terminal specifications.................................................27
(FR-HC2-7.5K to 75K, FR-HC2-H7.5K to H220K)...............................34
2.8 Wiring of main circuit (FR-HC2-H280K).............................................41
2.9 Wiring of main circuit (FR-HC2-H400K, H560K)................................47
CONTENTS
HC2.book I ページ 2012年11月19日 月曜日 午前10時52分