24
Installation of peripheral devices
(5) Installation orientation
To prevent looseness, install the reactor 1 (FR-HCL21) and the reactor 2 (FR-HCL22) on a horizontal surface securely
with screws or bolts.
Do not install them on a vertical wall. Install them on a mounting stand which can withstand their weight.
2.5.2
Installation of the outside box (FR-HCB2-7.5K to 75K, FR-HCB2-H7.5K to H220K)
(1) Clearance
(2) Installation area
Mount the outside box (FR-HCB2) on nonflammable material. Installing it directly on flammable material will cause a fire.
(3) Surrounding environment
Avoid places where the equipment is subjected to oil mist, flammable gases, fluff, dust, dirt, etc.
Install the equipment in a clean place or protect it from suspended substances.
(4) Installation
Install the outside box (FR-HCB2) vertically.
NOTE
Since the charged sections of the reactor 1 and the reactor 2 are uncovered, fully protect them to prevent ground fault
and electric shock.
10cm or more
10cm or more
5cm or more
5cm or more
NOTE
Since the charged sections of the outside box are
uncovered, take sufficient protective measures to
avoid ground faults and electric shocks.
Vertical
HC2.book 24 ページ 2012年11月19日 月曜日 午前10時52分