background image

This manual confers no industrial property rights or any rights of any other 
kind, nor does it confer any patent licenses. Mitsubishi Electric Corporation 
cannot be held responsible for any problems involving industrial property rights 
which may occur as a result of using the contents noted in this manual.

Warranty

Mitsubishi will not be held liable for damage caused by factors found not to be 
the cause of Mitsubishi; opportunity loss or lost profits caused by faults in the 
Mitsubishi products; damage, secondary damage, accident compensation 
caused by special factors unpredictable by Mitsubishi; damages to products 
other than Mitsubishi products; and to other duties.

For safe use

This product has been manufactured as a general-purpose part for general 
industries, and has not been designed or manufactured to be incorporated in 
a device or system used in purposes related to human life.
Before using the product for special purposes such as nuclear power, electric 
power, aerospace, medicine or passenger movement vehicles, consult with 
Mitsubishi Electric.
This product has been manufactured under strict quality control. However 
when installing the product where major accidents or losses could occur if the 
product fails, install appropriate backup or failsafe functions in the system.

HEAD OFFICE : TOKYO BUILDING, 2-7-3 MARUNOUCHI, CHIYODA-KU, TOKYO 100-8310, JAPAN

7. Function specification

7.1 Transfer function

: Available to transfer 

: Unavailable to transfer

*1 Ver.01.08.00 or later of the standard monitor OS of the GT10 is applicable.
*2 Ver.01.11.00 or later of the standard monitor OS of the GT10 is applicable.
*3 Ver. 2.91V or later of GT Designer2 or Ver. 1.01B or later of GT Designer3 are

applicable.

*4 It takes longer time to transfer the font data than to transfer the standard

monitor OS and communication driver.

(It takes approximately 1 minute and 45 seconds to transfer "Standard

monitor OS + Communication driver". It takes approximately 8 minutes to

transfer "Standard monitor OS + Communication Font data".)

Japanese (supporting Europe) is installed in the GT10 before shipment from

the factory.

It is not necessary to transfer the font data when the used font is not changed.

7.2 Password reset function on the GOT

When reading out the project data from the memory loader, if the password is set in 
the project data, password entry screen will appear on the GOT.
After entering the password, password is reset by pressing the ENT key on the 
screen. The data will be transferred from the GOT to the memory loader.
The operation procedure is described below.
When this function is used, Ver.01.08.00 or later of the standard monitor OS of the 
GT10 is required.

1) When the upload is started, password

entry screen will appear on the GOT 
Touch the "INPUT" key.

2) After inputting password, touch the "ENT"

key.

3) When the password matches, a message

notifying Password correct is display.
Touch the 

 button to close the

screen.

When the password does not match, an
error message is displayed.
If 

 button is touch it returns to the

password input screen again.

7.3 Error display function

If an error occurs between the GOT and the memory loader during the transfer, an 
error message will appear on the GOT screen.
Apply remedies according to the display.

   

 Chapter 12 Troubleshooting

Turning OFF and ON the power or touching the screen will close the error message 
screen.
When this function is used, Ver.01.08.00 or later of the standard monitor OS of the 
GT10 is required.

Transfer direction

Data 

selection 

switch

Transfer data

Operation

Project

 data

Resource 

data

Standard

 monitor OS

Font

data

*2

Communication

driver

1) PC

Memory loader

--

*3

After all data in the memory loader is deleted, the data 

selected with GT Designer2 or GT Designer3 is written 

to the memory loader all at once.

2) Memory loader

PC

--

The project data or resource data is read out from the 

memory loader to a PC.

3) Memory loader

GOT

OS

*4

All data in the memory loader is written to the GOT.

PROJECT

Only the project data in the memory loader is written 

to the GOT.

4) GOT

Memory loader

OS*

1

After all data in the memory loader is deleted, all data 

in the GOT is read out to the memory loader.

PROJECT

After all data in the memory loader is deleted, only the 

project data and resource data in the GOT are read 

out to the memory loader.

Standard monitor OS
Font data
Communication driver 
Project data

Standard monitor OS
Font data
Communication driver 
Project data

PC

(GT Designer2, GT Designer3)

Project data
Resource data

Memory loader

Standard monitor OS
Communication driver
Project data
Resource data

GT1020, GT1030

1)

2)

4)

3)

ESC

OK

Error message on the GOT

8. Installation of Driver, Setting Software

When the communication between a PC (GT Designer2 Ver.2.77F or later, GT 
Designer3 Ver.1.01B or later) and the memory loader is performed, driver 
installation, communication port setting is required.

8.1 Driver installation

When the communication between a PC (GT Designer2, GT Designer3) and the 
memory loader is performed, driver installation is required. Refer to the following 
manual for details about driver installation.

    

 GT Designer2 Version  Basic Operation/Data Transfer Manual

GT Designer3 Version  Screen Design Manual (Fundamentals)

8.2 Confirmation of communication port

Windows

®

 XP example follows.

In Windows

®

 XP, click [ Start ] 

 [ Settings ] 

 [ Control Panel ] 

[ Performance and Maintenance ] 

 [ System ] 

 [ Hardware ] 

 [ Device 

Manager (D) ] and the window below will be displayed.

Please confirm the COM number to which the USB driver is allocated (COM and 

LPT).

If using Windows

®

 98, Windows

®

 98SE, Windows

®

 Millennium Edition or 

Windows

®

 2000

A screen that is equivalent to the one below is displayed by clicking [ My 

Computer ] 

 [ Control Panel ] 

 [ System ] 

 [ Device Manager ] in the 

menu of the personal computer.

If using Windows

®

 Vista. A screen that is equivalent to the one below is 

displayed by clicking [ Start  ] 

 [ Control Panel ] 

 [ Device Manager ] in the 

menu of the personal computer.

Check following:

- GT10-LDR is indicated at A).
- GT10-LDR (COM *) is indicated at B).

* indicates the COM number used in Memory loader. 

- Install the GT Designer2 or GT Designer3 again when 

 is displayed.

Select the GT Designer2 or GT Designer3 COM number as the COM number 
currently assigned on the screen above.

8.3 Setting GT Designer2

Click [ Communication ] 

 [ Communicate with GT10-LDR ] 

 [ Communication 

configuration tab ].
Select the same COM number as the COM number of the personal computer when 
the setting communication port screen appears.
Click [ Update ].

8.4 Setting GT Designer3

Click [ Communication ] 

 [ Communicate with GT10-LDR... ] to display the

communicate with GT10-LDR screen.
Click the [ Communication Configuration... ] tab to display the communication
configuration dialog.
Select the same COM number as the COM number of the personal computer when
the setting communication port screen appears.
Click [ OK ].

9. Transfer procedures between a PC and the Memory 

loader

9.1 To write the data from a PC (GT Designer2 Ver.2.77F or later, 

GT Designer3 Ver.1.01B or later) to the memory loader

The standard monitor OS, communication driver, font data, and project data are 
written from a PC (GT Designer2, GT Designer3) to the memory loader. The 
operation procedure is described below. 

1) Turn OFF the Write protection switch.
2) Connect a PC (GT Designer2, GT Designer3) to the memory loader with USB

cable supplied.

3) Write the data from a PC (GT Designer2, GT Designer3) to the memory loader.

Refer to the following manual for details about operating instructions of GT 
Designer2 or GT Designer3.

    

 GT Designer2 Version  Basic Operation/Data Transfer Manual

GT Designer3 Version  Screen Design Manual (Fundamentals)

A)

B)

Memory loader

Standard monitor OS
Communication driver
Font data
Project data

PC

(GT Designer2, GT Designer3)

9.2 To read out the data from the memory loader to a PC (GT 

Designer2 Ver.2.77F or later, GT Designer3 Ver.1.01B or 
later).

The project data and resource data are read out from the memory loader to a PC 
(GT Designer2, GT Designer3). The operation procedure is described below.

1) Connect a PC (GT Designer2, GT Designer3) to the memory loader with USB

cable supplied.

2) Select the data to be uploaded in a PC (GT Designer2, GT Designer3) and read it

out from the memory loader.

Refer to the following manual for details about operating instructions of GT 
Designer2 or GT Designer3.

   

 GT Designer2 Version  Basic Operation/Data Transfer Manual

GT Designer3 Version  Screen Design Manual (Fundamentals)

10. To write the data from the Memory loader to the GOT

The standard monitor OS, communication driver, font data, and project data are 
written from the memory loader to the GOT. The operation procedure is described 
below.

10.1 When the Data selection switch is [P OS]

1) Connect the memory loader to the GOT.
2) Turn ON the GOT by pressing the lower right corner of the GOT.

(The GOT startups with OS installation screen.)
The OS can be transferred from GT Designer2 Version2 or GT Designer3 
Version  without displaying the OS installation screen depending on the 
combination of the GOT and the standard monitor OS.
Refer to the following manual for details about OS installation screen. 

   

 GT10 User's Manual

3) Set the Data selection switch to [P OS] and the RD/WR selection 

switch to [WR], and select the data to be transferred and transfer direction.

4) Press the ENT key to determine the data to be transferred and transfer direction. 

(SET/RUN LED will be orange.)
*: If the next operation is not performed within 30 seconds after the ENT key is 
pressed, SET/RUN LED will be unlit, and the operations that have been made will 
be canceled.
*: When the Data selection switch or the RD/WR selection switch is operated, 
after the data to be transferred and the transfer direction are determined, the 
operations that have been made will be canceled.

5) Press the ENT key again to start the transfer. (SET/RUN LED will be green 

flashing.)

6) Turn OFF the GOT and remove the memory loader after the transfer is 

completed. (SET/RUN LED will be green flashing.)

Refer to the "Chapter 12 Troubleshooting" for details on handling errors during 
transferring.

10.2 When the Data selection switch is [PROJECT]

1) Connect the memory loader to the GOT and turn ON the GOT.
2) Set the Data selection switch to [PROJECT] and the RD/WR selection switch to 

[WR], and select the data to be transferred and transfer direction.

3) Press the ENT key to determine the data to be transferred and transfer direction. 

(SET/RUN LED will be orange.)
*: If the next operation is not performed within 30 seconds after the ENT key is 
pressed, SET/RUN LED will be unlit, and the operations that have been made will 
be canceled.
*: When the Data selection switch or the RD/WR selection switch is operated, 
after the data to be transferred and the transfer direction are determined, the 
operations that have been made will be canceled.

4) Press the ENT key again to start the transfer. (SET/RUN LED will be green 

flashing.)

5) Turn OFF the GOT and remove the memory loader after the transfer is 

completed. (SET/RUN LED will be green flashing.)

Refer to the "Chapter 12 Troubleshooting" for details on handling errors during 
transferring.

11. To read out the data from the GOT to the Memory 

loader

The standard monitor OS, communication driver, project data, and resource data 
are read out from the GOT to the memory loader. The operation procedure is 
described below.

11.1 When the Data selection switch is [P OS]

1) Turn OFF the Write protection switch.
2) Connect the memory loader to the GOT and turn ON the GOT.
3) Set the Data selection switch to [P OS] and the RD/WR selection 

switch to [RD], and select the data to be transferred and transfer direction.

4) Press the ENT key to determine the data to be transferred and transfer direction. 

(SET/RUN LED will be orange.)
*: If the next operation is not performed within 30 seconds after the ENT key is 
pressed, SET/RUN LED will be unlit, and the operations that have been made will 
be canceled.
*: When the Data selection switch or the RD/WR selection switch is operated, 
after the data to be transferred and the transfer direction are determined, the 
operations that have been made will be canceled.

5) Press the ENT key again to start the transfer. (SET/RUN LED will be green 

flashing.)

6) Turn OFF the GOT and remove the memory loader after the transfer is 

completed. (SET/RUN LED will be green flashing.)

Refer to the "Chapter 12 Troubleshooting" for details on handling errors during 
transferring.

PC

(GT Designer2, GT Designer3)

Memory loader

Project data
Resource data

Standard monitor OS
Communication driver
Font data
Project data

Memory loader

GT1020, GT1030

Project data

Memory loader

GT1020, GT1030

Project data
Communication driver
Standard monitor OS
Resource data

Memory loader

GT1020, GT1030

11.2 When the Data selection switch is [PROJECT]

1) Turn OFF the Write protection switch.
2) Connect the memory loader to the GOT and turn ON the GOT.
3) Set the Data selection switch to [PROJECT] and the RD/WR selection switch to 

[RD], and select the data to be transferred and transfer direction.

4) Press the ENT key to determine the data to be transferred and transfer direction. 

(SET/RUN LED will be orange.)
*: If the next operation is not performed within 30 seconds after the ENT key is 
pressed, SET/RUN LED will be unlit, and the operations that have been made will be 
canceled.
*: When the Data selection switch or the RD/WR selection switch is operated, after 
the data to be transferred and the transfer direction are determined, the operations 
that have been made will be canceled.

5) Press the ENT key again to start the transfer. (SET/RUN LED will be green flashing.)
6) Turn OFF the GOT and remove the memory loader after the transfer is completed. 

(SET/RUN LED will be green flashing.)

Refer to the "Chapter 12 Troubleshooting" for details on handling errors during 
transferring.

12. Troubleshooting

12.1 GOT error message

When communication between the GOT and the memory loader does not work, check 
the following contents depending on the GOT error messages.

GOT error message

Remedy

Write protection 

switch is ON

Write protection switch ON

Turn OFF the Write protection switch.

Wrong GOT model is 

connected

The GOT type that is set in the data to be transferred differs 

from that of the GOT to which the data is transferred.

Check the GOT type to which the memory loader is 

connected.

Corrupt data or OS 

version variance

The data to be transferred is broken, or the major version of 

the standard monitor OS is different from that of the project 

data.

Write the standard monitor OS, communication driver, and 

project data from GT Designer2 or GT Designer3 to the 

memory loader again, and then transfer them to the GOT 

again. 

Set the Data selection switch to [P OS] and 

read out all data from the GOT to the memory loader, and 

then transfer them to the GOT again.

Communication error

Communication error occurs between the GOT and the 

memory loader.

Check the connection with the communication cable.

Check that power supply is stable. (lighting of POWER 

LED)

GOT contains a 

system password

Password is set in the project data.

Reset the password with the numeric keypad on the GOT.

OS installation 

screen isn’t active

OS installation screen is not active

Install the data after the OS installation screen is displayed on 

the GOT.

Project data
Resource data

Memory loader

GT1020, GT1030

12.2 LED display on the memory loader

If communication cannot be established between the GOT and a PC using 
memory loader, confirm the following status by checking display LED in memory 
loader.

State of 

POWER LED

Contents

POWER LED 

is lit. 

The DC5V power supply from the GOT or the personal 

computer is normally supplied. In case of no communication, 

check the status of ERROR LED.

POWER LED 

is not lit. 

The DC 5V power supply from the GOT or the personal 

computer is not supplied. Check the items below. 

Turn ON the power.

Check the connection with the USB cable.

Check the connection with the GOT.

Check that PLC is not overloaded when PLC supplies the 

power to the GOT connected to the memory loader.

State of 

ERROR LED

Contents

Green light

Write protection switch ON

Turn OFF the Write protection switch.

Green 

flashing

The GOT type that is set in the data to be transferred differs 

from that of the GOT to which the data is transferred.

Check the GOT type to which the memory loader is connected.

Red light

The data to be transferred is broken, or the major version of the 

standard monitor OS is different from that of the project data.

Write the standard monitor OS, communication driver, and 

project data from GT Designer2 or GT Designer3 to the 

memory loader again, and then transfer them to the GOT 

again. 

Set the Data selection switch to [P OS] and read 

out all data from the GOT to the memory loader, and then 

transfer them to the GOT again.

Red flashing

Communication error occurs between the GOT and the memory 

loader.

Check the connection with the communication cable.

Check that power supply is stable. (lighting of POWER LED)

Red

Green

Password is set in the project data.

Reset the password with the numeric keypad on the GOT.

Orange

Green

OS installation screen is not active

Install the data after the OS installation screen is displayed on 

the GOT.

Summary of Contents for GT10-LDR

Page 1: ... Acceleration Half amplitude Sweep Count Under intermittent vibration 5 to 9Hz 3 5mm 10 times each in X Y and Z directions 9 to 150Hz 9 8m s2 Under continuous vibration 5 to 9Hz 1 75mm 9 to 150Hz 4 9m s2 Shock resistance Conforms to JIS B3502 IEC 61131 2 147 m s2 3 times each in X Y and Z directions Operating atmosphere Must be free of lamp black corrosive gas flammable gas or excessive amount of ...

Page 2: ... Acceleration Half amplitude Sweep Count Under intermittent vibration 5 to 9Hz 3 5mm 10 times each in X Y and Z directions 9 to 150Hz 9 8m s2 Under continuous vibration 5 to 9Hz 1 75mm 9 to 150Hz 4 9m s2 Shock resistance Conforms to JIS B3502 IEC 61131 2 147 m s2 3 times each in X Y and Z directions Operating atmosphere Must be free of lamp black corrosive gas flammable gas or excessive amount of ...

Page 3: ...T The standard monitor OS communication driver font data and project data are written from the memory loader to the GOT The operation procedure is described below 10 1 When the Data selection switch is PROJECT OS 1 Connect the memory loader to the GOT 2 Turn ON the GOT by pressing the lower right corner of the GOT The GOT startups with OS installation screen The OS can be transferred from GT Desig...

Page 4: ...T The standard monitor OS communication driver font data and project data are written from the memory loader to the GOT The operation procedure is described below 10 1 When the Data selection switch is PROJECT OS 1 Connect the memory loader to the GOT 2 Turn ON the GOT by pressing the lower right corner of the GOT The GOT startups with OS installation screen The OS can be transferred from GT Desig...

Page 5: ... Acceleration Half amplitude Sweep Count Under intermittent vibration 5 to 9Hz 3 5mm 10 times each in X Y and Z directions 9 to 150Hz 9 8m s2 Under continuous vibration 5 to 9Hz 1 75mm 9 to 150Hz 4 9m s2 Shock resistance Conforms to JIS B3502 IEC 61131 2 147 m s2 3 times each in X Y and Z directions Operating atmosphere Must be free of lamp black corrosive gas flammable gas or excessive amount of ...

Page 6: ...T The standard monitor OS communication driver font data and project data are written from the memory loader to the GOT The operation procedure is described below 10 1 When the Data selection switch is PROJECT OS 1 Connect the memory loader to the GOT 2 Turn ON the GOT by pressing the lower right corner of the GOT The GOT startups with OS installation screen The OS can be transferred from GT Desig...

Reviews: