background image

15

                                     

   

JEP0-IL9557

 

External dimensions and Panel cut-out 

 

 

152 

167

 

83

.5

 

83

.5

 

 

 
 
 
 
 
 
 
 

11-M3.5 screw 

32 

φ

138

 

136 

104 

13 

2-M6 screw 

 

 

124 

124

 

φ

140

~φ

142 

2-

φ

7 hole 

Minimum pitch 

180 

 

Minimum pitch

 

1

80

 

 

Fig. 5-8  MOV-A3V-R                            (Unit: mm) 

 

 

 

 

 

 

152 

167

 

83

.5

 

83

.5

 

 

 
 
 
 
 
 
 
 

14-M3.5 screw 

32 

φ

138

 

136 

104 

2-M6 screw 

46

 

11 

36 

 

 

124 

124

 

φ

140

~φ

142 

2-

φ

7 hole 

Minimum pitch 

182 

 

Minimum pitch

 

1

80

 

 

Fig. 5-9  MOV-A3V-RD                            (Unit: mm) 

 

 

Improvement on the reliability of protection function                                                                         

 

Any parts and materials applied to the protection relay have limited lifetime which will bring the degradation to 

the  relay.  The  degree  of  degradation  will  be  variable  depending  on  the  purpose,  aging,

 

usage  environment,  and 

unevenness on the performance of each part. 

Our company designs its products so that the recommended renewal period is 15 years or more. 

However, there may be some possibilities to occur any failures before reaching 15 years due to above reasons. 

To prevent unwanted operation or no operation of relay, it is recommended to apply the relay with self-diagnosis 

function and/or multiplexing relay system such as dual or duplex scheme. 

 
 

Same as the center of panel cut-out

 

Summary of Contents for MELPRO MOV-A3V-R

Page 1: ...1 JEP0 IL9557 Request Ensure that this Instruction Manual is delivered to the end users and the maintenance manager ...

Page 2: ...t Failure to do so may lead to the risk of electric shock equipment failure malfunction or failure to operate Ensure that the equipment is connected correctly in accordance with the details e g polarity or phase sequence shown on the connection terminals Otherwise there is the risk of failure burning malfunction or maloperation All power supplies and transformers to the equipment must be of suitab...

Page 3: ...el Otherwise there are risks of electric shock injury failure malfunction and maloperation Handling and maintenance of the equipment must only be carried out after gaining a thorough understanding of the instruction manual Otherwise there is the risk of electric shock injury failure malfunction or maloperation When replacing the equipment use a product of same model rating and specifications Other...

Page 4: ... special damages and secondary damages whether foreseeable or not compensation for accidents and compensation for damages to products other than MITSUBISHI ELECTRIC CORPORATION products and other tasks 4 Applications of products 1 The user is requested to confirm the standards the regulations and the restrictions which should be applied in case of utilizing this product and another one in combinat...

Page 5: ...ecommended to replace 2 Product supply including repair parts is not available after production is discontinued 6 Changes in product specification The specification given in the catalogue manuals or technical documents are subject to change without prior notice 7 Scope of service The technical service fee such as engineer dispatching fee is excluded in the price of our products Please contact to o...

Page 6: ...0 5 0s Frequency 50Hz SW1 ON 60Hz SW1 OFF Display Self monitoring The RUN indicator green color is lighted in normal condition Operation indicator The indicator turns from black into orange color when the protection element is put into operation Manual resetting type Numerical display 1 Lo means LOCK setting the protection element is locked Indication item Range Voltage measurement 80 160V Pickup ...

Page 7: ...m Input 0V 165V for 10s Criteria The relay shall operate Vibration Frequency Hz Peak to peak amplitude mm Acceleration m s2 Vibration time s Setting Minimum operation value and minimum operating time Input 90 of setting value Criteria No malfunction and no abnormal indication Forward backward Right left Up down 10 5 10 2 5 5 30 16 7 0 4 2 600 Shock Maximum acceleration 300m s2 Direction 3 directio...

Page 8: ...p When input voltage is greater than or equal to the setting value U is displayed This function can be used for operation value tests CPU reset button While this button is pressed the relay function is locked and the RUN indicated LED is turned off RUN indicated LED Green It shows the result of self monitoring It lights up in normal condition Setting switches for operation value and time Set the s...

Page 9: ...after the relay operation Clearing of fault records Set indicator select switch to CLEAR FAULT REC and hold for 5s or more then O K is displayed and all of the fault record are cleared 5 Display function of setting change When a setting is changed the setting value after changing is displayed for approx 3s preferentially 6 Detection function of frequency difference If there is a difference between...

Page 10: ...conditions Please refrain from changing the setting value during operation since unwanted operation may occur However if the setting change is unavoidable please press the CPU reset button in order to lock the relay function Don t leave rotary switches with halfway indefinite state The RUN LED lights up in the normal condition when the rated voltage is input If it still turns off when the input vo...

Page 11: ...there is no problem Voltage applied terminals External box Fixing screw for mounting b Apply 2000V AC commercial frequency between separate circuits for one minute and make sure that there is no problem Voltage applied terminals 3 Operation characteristics test When the rated voltage is applied the RUN display LED green lights up This indicates that the relay works properly When adjusting the test...

Page 12: ...the electrical circuit e g substrate capacitor and transformer and be sure to hold the drawer handle or the frame part when transporting Touching the electrical circuit may cause electric shock or damage to the circuit Before the subunit is to be drawn out ensure that the following items are checked in order not to carry out the work in hot line condition Lock of the tripping circuit Turning off t...

Page 13: ...the subunit with your finger hooked on the drawer handle on both sides Support the frame of subunit and pull out 2 Procedure of housing Drawer fixing screw Support the frame of subunit and place the subunit in the case along the rails Insert the subunit into the case horizontally Open the cover and tighten the drawer fixing screw Cover Cover ...

Page 14: ...up the upper side of the cover from the inner surface Then remove from the protrusion of the body Installing the cover As shown in Fig 5 7 mount the holes on the upper side of the cover to the protrusion of the body Then press down lightly on the lower side of the cover and mount to the protrusion of the body in the same way as above When replacing the cover during operation be careful not to touc...

Page 15: ...ed to the protection relay have limited lifetime which will bring the degradation to the relay The degree of degradation will be variable depending on the purpose aging usage environment and unevenness on the performance of each part Our company designs its products so that the recommended renewal period is 15 years or more However there may be some possibilities to occur any failures before reach...

Page 16: ...HEAD OFFICE 7 3 MARUNOUCHI 2 CHOME CHIYODA KU TOKYO 100 8310 JAPAN First edition Jan 2021 ...

Reviews: