APPENDIX
App. - 20
App. 4.9 Check list for user documentation
MR-J4 installation checklist for manufacturer/installer
The following items must be satisfied by the initial test operation at least. The manufacturer/installer must
be responsible for checking the standards in the items.
Maintain and keep this checklist with related documents of machines to use this for periodic inspection.
1. Is it based on directive/standard applied to the machine?
Yes [ ], No [ ]
2. Is directive/standard contained in Declaration of Conformity (DoC)?
Yes [ ], No [ ]
3. Does the protection instrument conform to the category required?
Yes [ ], No [ ]
4. Are electric shock protective measures (protective class) effective?
Yes [ ], No [ ]
5. Is the STO function checked (test of all the shut-off wiring)?
Yes [ ], No [ ]
Checking the items will not be instead of the first test operation or periodic inspection by professional
engineers.
Summary of Contents for MR-J4-100B(-RJ)
Page 17: ...8 MEMO ...
Page 143: ...4 STARTUP 4 20 MEMO ...
Page 199: ...5 PARAMETERS 5 56 MEMO ...
Page 227: ...6 NORMAL GAIN ADJUSTMENT 6 28 MEMO ...
Page 281: ...8 TROUBLESHOOTING 8 16 MEMO ...
Page 303: ...9 DIMENSIONS 9 22 MEMO ...
Page 319: ...10 CHARACTERISTICS 10 16 MEMO ...
Page 429: ...11 OPTIONS AND PERIPHERAL EQUIPMENT 11 110 MEMO ...
Page 435: ...12 ABSOLUTE POSITION DETECTION SYSTEM 12 6 MEMO ...
Page 483: ...14 USING A LINEAR SERVO MOTOR 14 34 MEMO ...
Page 531: ...16 FULLY CLOSED LOOP SYSTEM 16 26 MEMO ...
Page 613: ...17 APPLICATION OF FUNCTIONS 17 82 MEMO ...
Page 654: ...APPENDIX App 41 ...