A - 6
(5) Corrective actions
CAUTION
Ensure safety by confirming the power off, etc. before performing corrective actions. Otherwise, it may
cause an accident.
If it is assumed that a power failure, machine stoppage, or product malfunction may result in a hazardous
situation, use a servo motor with an electromagnetic brake or provide an external brake system for
holding purpose to prevent such hazard.
When any alarm has occurred, eliminate its cause, ensure safety, and deactivate the alarm before
restarting operation.
If the molded-case circuit breaker or fuse is activated, be sure to remove the cause and secure safety
before switching the power on. If necessary, replace the servo amplifier and recheck the wiring.
Otherwise, it may cause smoke, fire, or an electric shock.
Provide an adequate protection to prevent unexpected restart after an instantaneous power failure.
Configure an electromagnetic brake circuit which is interlocked with an external emergency stop switch.
Servo motor
Electromagnetic brake
B
RA
Contacts must be opened
with the emergency stop switch.
Contacts must be opened when ALM
(Malfunction) or MBR (Electromagnetic
brake interlock) turns off.
24 V DC
U
To prevent an electric shock, injury, or fire from occurring after an earthquake or other natural disasters,
ensure safety by checking conditions, such as the installation, mounting, wiring, and equipment before
switching the power on.
(6) Maintenance, inspection and parts replacement
CAUTION
Make sure that the emergency stop circuit operates properly such that an operation can be stopped
immediately and a power is shut off by the emergency stop switch.
It is recommended that the servo amplifier be replaced every 10 years when it is used in general
environment.
When using a servo amplifier whose power has not been turned on for a long time, contact your local
sales office.
(7) General instruction
To illustrate details, the equipment in the diagrams of this Instruction Manual may have been drawn
without covers and safety guards. When the equipment is operated, the covers and safety guards must
be installed as specified. Operation must be performed in accordance with this Instruction Manual.
Summary of Contents for MR-JE-C Series
Page 9: ...A 8 MEMO ...
Page 13: ...4 MEMO ...
Page 33: ...2 CC Link IE Field Network Basic SLMP 2 16 MEMO ...
Page 73: ...5 PARAMETERS 5 14 MEMO ...
Page 79: ...6 MANUFACTURER FUNCTIONS 6 6 MEMO ...
Page 143: ...MEMO ...