12
●
The MDU has the reset switch, address (station number) setting switch (when CC-Link communication functions are equipped) and
communication speed setting switch (when CC-Link communication function is equipped).
Install the MDU onto a position where you can easily perform reset operation and change settings.
Caution
5.3 MDU installation (separate installation)
(1) Installation to the IEC rail (35 mm)
[1] Hook it on.
IEC rail
IEC rail installation fastener
[2] Push it in.
Removable
connector
Screws
[3] Loosen the two screws
of the removable connector
and remove the connector.
IEC rail installation fastener
[5] Pull up the unit.
[4] Lower the IEC rail
installation fastener.
Installation groove
Terminal cover
When reattaching the removed terminal cover,
hook it up to the installation groove.
(3) Connection cable installation
Open the terminal cover of the MDU and connect
the connection cable to the connector.
(2) Removal from the IEC rail (35 mm)
Screwdriver insertion
position
[1] Insert the screwdriver.
[2] Remove
the connector
cover.
Connector
cover
Summary of Contents for NF400-HEW
Page 55: ......
Page 56: ...LN107A329H02 IB63E31 A 1911 MEE MDU Breakers Nov 2019 ...