CYLINDER UNIT OPTIONAL PARTS
IMME
RSION HEATER (1Ph 3kW)
PAC-IH03V2-E
WARNING
●
●
●
●
●
INSTALLATION MANUAL
If the cylinder has already been connected to the power supply ensure circuit breaker is off before carrying out electrical
work.
If the immersion heater is installed incorrectly or modified after installation by the user, water leakage, electric shock or
fire may result.
All electrical work should be performed by a qualified technician according to local regulations and the instructions given
in this manual.
The immersion heater must be powered by a dedicated power supply and the correct voltage and correctly sized circuit
breakers must be used.
Connections must be made securely and without tension on the terminals.
The included component parts of the PAC-IH03V2-E IMMERSION HEATER (1Ph 3kW) shall be used only for the
purposes indicated in the installation manual.
● Before starting installation, read the following description together with the installation manual included with the cylinder unit.
● Please read carefully and observe fully the following safety precautions.
Precaution that must be observed to prevent injuries or death.
WARNING
After installation carry out a test run to ensure correct operation, then explain operation method and safety precautions to the
end user.
Tell your customers to keep this installation manual together with the operation manual, and when they give or sell this
machine to any other person include this installation manual and operation manual with it.
●
Optional parts
D-25
Immersion Heater
3
Optional parts